Supporting low-carbon strategies in the area of the town and municipality of Szamotuły through the construction of the Integrated Neighbours in Szamotuły, Pamiątków and Baborówko and the infrastructure. (Q134929)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Supporting low-carbon strategies in the area of the town and municipality of Szamotuły through the construction of the Integrated Neighbours in Szamotuły, Pamiątków and Baborówko and the infrastructure. |
Project in Poland financed by DG Regio |
Statements
2,960,713.1 zloty
0 references
4,324,012.96 zloty
0 references
85.0 percent
0 references
23 March 2017
0 references
29 December 2017
0 references
MIASTO I GMINA SZAMOTUŁY
0 references
Proj.realizo. będzie w ramach 5 zadań i będzie obejmo. budowę 3 zintegrowanych węzłów przesiadkowych(ZWP)z infrastrukturą:1.Budowa ZWP w Szamotułach(Roboty przygotow. i rozbiórkowe, nawierzchnie z k.granitowej,zatoka autobus.,opaski,dr.manewr.-1056m2,parkingi Pamp;R(83msc w tym 2dla niepełnospr.-1047,5m2),Bamp;R(60msc),przebudowa sieci kanaliz. deszcz.,wjazdy, drogi rower.-500m2,chodniki-674 m2,oświetlenie-8szt.,tabl. inf. pasażerskiej-1szt.,wiaty rowerowe,przystanek autobusowy,tabl. rozkł. jazdy,tyflograficzna mapa stacji,płyty prowadzące,inwentaryzacja i proj.zieleni,roboty wykończ.,nadzór budowlany).2.Budowa ZWP w Pamiątkowie(Rob.przygotow. i rozbiórkowe,nawierzchnie z k.betonowej,dr.dojazd-840m2,parkingi Pamp;R(21miejsc-345m2),Bamp;R(20msc),proj.z odwodnieniem pow.,drogi rower.-412,5m2,chodnik-43,75m2,ciąg piesz-jezdny-1006,5m2,oświetlenie-1szt,tablica inf.pasaż.,wiata rower.,przystanek autobus.,tabl. rozkł.jazdy,tyflograficzna mapa stacji, płyty prowadzące,inwentaryzacja i proj.zieleni, roboty wykończ.)3.Budowa ZPW w Baborówku(Rob.przygotow. i rozbiórkowe,nawierzchnie z k.betonowej,droga manewr.-888m2,parkingi:Pamp;R(11msc,w tym 2dla niepełnospr.-147,5m2),Bamp;R(20msc),proj.z odwodnieniem pow.,drogi rower-1155m2,chodniki,oświetlenie-1szt,tabl. inf.pasażerskiej,wiata rowerowa,przystanek autobus.,tablica rozkł.jazdy,tyflograficzna mapa stacji,płyty prowadzące,inwentaryzacja i proj.zieleni, roboty wykończ.)4.Zakup rowerów miejskich z wyposażeniem,5.Dz.promocyjno-informacyjneProdukty proj.(rok osiągnięcia-2018)•Lb wybudowa. ZWP–3szt.•Lb wybudowa. obiektów„parkuj i jedź”–3 szt.•Lb miejsc postoj. w wybudowanych obiektach„parkuj i jedź”–115szt.•Lb miejsc postoj. dla os. niepełnospra. w wybudowanych obiektach„parkuj i jedź”–4szt.•Lb wybudowanych obiektów„Bikeamp;Ride”–3szt.•Lb stanowisk postoj. w wybudowanych obiektach„Bikeamp;Ride”–100szt.•Dł wspartej infrastru. rowero.- 1,01 km•Lb akcji i kampanii informacyjno-promocyjnych–1szt.•Lb nowych/zmoder.pkt świetlnych-10szt. (Polish)
0 references
Proj.realizo. will be part of five tasks and will include. construction of 3 integrated interchanges (ZWP) with infrastructure: 1. Construction of the ZWP in Szamotuły (preparation and demolition works, surfaces made of granite, bus bay, clamps, dr-maneuver-1056m2, Pamp car parks; R (83msc in including 2 for disabled - 1047,5m2), Bamp; R (60msc), reconstruction of the rainwater sewage system, entrances, bicycle paths - 500m2, walkways - 674 m2, lighting - 8 pcs, passenger information board - 1 pc. , bicycle sheds, bus stop, distribution board, typographic map of the station, guide plates, inventory and green design, finishing works, construction supervision). 2. Construction of ZWP in Pamiątkow (Preparation and demolition works, surfaces with concrete, road access-840m2, parking lots Pamp; R (21 places - 345m2), Bamp; R (20msc), project with drainage area, road bicycle - 412,5m2, pavement - 43.75m2, pedestrian path - driveway - 1006.5 m2, lighting - 1 pc, passenger information board, bicycle shed, bus stop, distribution board, typographic map of the station, guide plates, inventory and green design, finishing works) 3. Building ZPW in Baborówko (Rob. Preparing and demolition, concrete pavement, maneuvering road - 888m2, parking lots: Pamp; R (11msc, including 2 for disabled - 147.5m2), Bamp; R (20msc), project with drainage area, road bike -1155m2, sidewalks, lighting-1pc, Table. passenger information, bicycle shed, bus stop, timetable, journeys, typographic map of the station, guide plates, green inventory and design, finishing works) 4. Purchase of city bikes with equipment, 5. Promotion and information products. (year of achievement-2018) • Lb construction. ZWP - 3 items • Lb built. park and ride facilities - 3 items • Lb parking spaces in built "park and drive" facilities - 115 items • Number of parking spaces for persons niepełnospra. in the built "park and ride" facilities - 4 items • Number of constructed "Bikeamp; Ride" facilities - 3 items • Lb parking spaces in built facilities "Bikeamp; Ride" - 100 items • Length of supported infrastructure. bicycle - 1.01 km • Number of campaigns and information and promotion campaigns - 1 item • Number of new items / light modifiers - 10 items (English)
0 references
Identifiers
RPWP.03.03.03-30-0006/16