Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant (Q2982019)

From EU Knowledge Graph
Revision as of 15:07, 15 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2982019 in Portugal
Language Label Description Also known as
English
Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant
Project Q2982019 in Portugal

    Statements

    0 references
    196,854.22 Euro
    0 references
    30 June 2016
    0 references
    21 April 2017
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references
    0 references

    39°15'35.78"N, 8°35'4.24"W
    0 references
    Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
    0 references
    It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English)
    9 July 2021
    0 references
    Alpiarça, Alpiarça
    0 references

    Identifiers

    POSEUR-03-2012-FC-000040
    0 references