No label defined (Q2982586)

From EU Knowledge Graph
Revision as of 02:00, 9 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The operation is an investment to improve and increase access to high-quality SAR services, while reducing the pollution levels of water bodies. The practical result of the operation is the construction of a system of drainage and treatment of domestic root sewage, including network, lifting systems and sewage treatment, to serve local populations., translated_summary)
Jump to navigation Jump to search
Project Q2982586 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982586 in Portugal

    Statements

    0 references
    268,315.76 Euro
    0 references
    85.0 percent
    0 references
    30 November 2016
    0 references
    8 April 2020
    0 references
    MUNICÍPIO DE MÉRTOLA
    0 references
    0 references

    37°43'0.12"N, 7°28'34.72"W
    0 references
    A operação configura um investimento com vista à melhoria e aumento do acesso das populações de Montes Altos a serviços de SAR de elevada qualidade, simultaneamente reduzindo os níveis de poluição das massas de água. O resultado prático da operação é a construção de um sistema de drenagem e tratamento de águas residuais domésticas de raiz, incluindo rede, sistemas elevatórios e ETAR, para servir as populações locais. (Portuguese)
    0 references
    The operation is an investment to improve and increase access to high-quality SAR services, while reducing the pollution levels of water bodies. The practical result of the operation is the construction of a system of drainage and treatment of domestic root sewage, including network, lifting systems and sewage treatment, to serve local populations. (English)
    9 July 2021
    0 references
    Mértola, Corte do Pinto
    0 references

    Identifiers

    POSEUR-03-2012-FC-000842
    0 references