“Protection of biodiversity in the municipality of Iłowo-Osada by sewering traffic in protected areas” (Q2717376)

From EU Knowledge Graph
Revision as of 08:07, 26 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2717376 in Poland
Language Label Description Also known as
English
“Protection of biodiversity in the municipality of Iłowo-Osada by sewering traffic in protected areas”
Project Q2717376 in Poland

    Statements

    0 references
    1,033,423.08 zloty
    0 references
    229,729.95 Euro
    0.2223 Euro
    0 references
    1,215,791.86 zloty
    0 references
    270,270.53 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    26 February 2020
    0 references
    30 June 2023
    0 references
    GMINA IŁOWO-OSADA
    0 references

    53°10'1.2"N, 20°17'51.4"E
    0 references
    Przedmiotem proj. jest ochrona zasobów przyrod. oraz zmniejszenie presji na gatunki i siedliska chronione, w szczególności występujące w rezerwatach Świńskie Bagno, Dębowa Góra oraz o. Natura 2000 Dębowa Góra koło Mławy wraz z ich otoczeniem, poprzez kanalizację ruchu i edukację ekologiczną. Zad. obejmuje: prace przyg. (dok. proj., ekspertyzy przyrod.), nadzór, promocję, studium wyk., wyk. wirtualnej ścieżki do rezerwatu Dębowa Góra, roboty bud.: – w obsz. I Białuty: bud. ciągu pieszo-rowerowego do rez., „Świńskie Bagno” w tym nasadz. drzew oraz zagospod. terenu wokół stawu w Białutach (usunięcie odpadów, budowa ścieżek, pomostu obserwac., wzbogacenie trawników, wyk. łąki kwietnej, rabaty ziołowej, pergoli, budek pływ. dla kaczek, budek lęgowych, karmników, hoteli dla owadów, oświetl. i monitoringu, montaż ławek, koszy, fontanny, nasadzenia krzewów i kwiatów, wyk. tablicy informacyjnej i tablic dydaktycznych. - w obszarze II-IŁOWO: zagosp. terenu parku (rozbiórki, usunięcie odpadów, bud. ścieżek, w tym edukac., wyk. trawników wzbogaconych o odpow. gatunki, łąki kwietnej, instal. budek lęgowych, karmników, hoteli dla owadów, oświetl. i monitoringu, montaż ławek, koszy, altany, nasadzenia krzewów i kwiatów, wyk. tablicy informac. i tablic dydaktycznych. Projekt wpisuje się w SzOOP RPO WiM 2014-2020 dział.5.3 Ochrona różnorodności biologicznej, priorytet inwest.6d: Ochrona i przywrócenie różnorodności biologicznej, ochrona i rekult. gleby oraz wspieranie usług ekosystemowych, także poprzez program „Natura 2000” oraz zieloną infr. i cel szczegół.: Lepsze mechanizmy ochrony bioróżnorodności w regionie. Zakres przed. i zast. rozwiązania pozwolą na ograniczenie presji turyst., właściwe ukierunkowanie ruchu i ograniczenie dostępu do najwartościowszych ostoi. Uzupeł. siedlisk o typowe dla nich taksony pozwolą zachować ciągłość i prawidłowe funkcjonowanie korytarzy ekol. Planowane zagosp. stworzy warunki dla nowych siedlisk i wzrostu bioróżnorodności obszaru. (Polish)
    0 references
    The object of the project is the conservation of natural resources and the reduction of pressure on protected species and habitats, in particular in the sanctuaries of Świńskie Bagno, Dębowa Góra and Fr. Natura 2000 Dębowa Góra near Mława, together with their surroundings, through traffic sewerage and ecological education. The Regulation includes: work of nails. (proj., expert opinions), supervision, promotion, study, virtual path to the Dębowa Góra reserve, construction works: in a perimeter. And Białuty: the construction of a walking-bike route to the diz., “Świńskie Bagno” including plantings of trees and the area around the pond in Białuty (removal of waste, construction of paths, pier observation, enrichment of lawns, flower meadows, herbal discounts, pergolas, tidal booths. for ducks, breeding booths, feeders, hotels for insects, illumination. and monitoring, installation of benches, baskets, fountains, planting bushes and flowers, an information board and didactic boards. — in II-Ilovo: Zagosp. park area (dismantling, removal of waste, construction of paths, including education, fork. lawns enriched with species, flower meadows, installation. breeding booths, feeders, hotels for insects, lighting. and monitoring, installation of benches, baskets, gazebos, planting shrubs and flowers, ex. information boards and didactic boards. The project is part of the SzOOP ROP WiM 2014-2020 section.5.3 Protection of biodiversity, priority investment.6d: Protection and restoration of biodiversity, protection and restoration of soil and support of ecosystem services, including through the Natura 2000 programme and green infra and the specific objective: Better mechanisms to protect biodiversity in the region. The range of solutions before and after will allow to reduce the pressure of tourists., to properly target traffic and limit access to the most valuable bases. Additional habitats with typical taxa will allow the continuity and proper functioning of the environmental corridors. The planned settlement will create the conditions for new habitats and an increase in the biodiversity of the site. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.05.03.00-28-0002/20
    0 references