Reconstruction and extension of the water treatment plant in Hawłowice, commune of Pruchnik (Q2711846)

From EU Knowledge Graph
Revision as of 03:53, 26 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2711846 in Poland
Language Label Description Also known as
English
Reconstruction and extension of the water treatment plant in Hawłowice, commune of Pruchnik
Project Q2711846 in Poland

    Statements

    0 references
    1,998,420.76 zloty
    0 references
    444,248.93 Euro
    0.2223 Euro
    0 references
    3,861,682.65 zloty
    0 references
    858,452.05 Euro
    0.2223 Euro
    0 references
    51.75 percent
    0 references
    7 July 2020
    0 references
    31 December 2021
    0 references
    GMINA PRUCHNIK
    0 references

    49°54'22.0"N, 22°30'58.0"E
    0 references
    Celem głównym projektu jest zwiększenie liczby osób korzystających z wysokiej jakości usług zaopatrzenia w wodę na obszarze Gminy Pruchnik.Produkty projektu: Liczba wspartych stacji uzdatniania wody - 1 szt. Produkt zostanie osiągnięty na zakończenie realizacji inwestycji - I kw. 2021 r.Rezultaty projektu: Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę - 7237 osoby; Wydajność dobowa przebudowanych ujęć wody - 1500 m3/dobę. Efekty zostaną osiągnięte na zakończenie realizacji inwestycji - I kw. 2021 r.Zakres rzeczowy:1.Roboty budowlane-SUW w Hawłowicach-Budowa budynku stacji uzdatniania wody z instalacją technologiczną i sanitarną o przepustowości Qh max.= 100 m3/h ;-Rozbiórka istniejącego budynku stacji uzdatniania wody-Budowa dróg, placu parkingowego i chodników z kostki brukowej na terenie SUW-Budowa zbiorników wyrównawczych wody uzdatnionej o pojemności V=2x150 m3-Rozbiórka istniejącego zbiornika żelbetowego wody czystej o pojemności V=50 m3-Budowa na terenie stacji uzdatniania wody, sieci wodociągowych ciśnieniowych-Budowa na terenie stacji uzdatniania wody, sieci i przyłączy kanalizacyjnych grawitacyjnych i studzienek kanalizacyjnych-Budowa zbiornika bezodpływowego ścieków bytowych o pojemności V=4,0 m3-Odtworzenie stawu „Parkowego”-Budowa odstojnika popłuczyn z przyłączami kanalizacyjnymi i instalacją do odprowadzania wody nadosadowej-Budowa instalacji elektrycznej i sterowniczej w budynku stacji uzdatniania wody-Budowa sieci energetycznej i sterowniczej na terenie SUW -Budowa sieci oświetleniowej na terenie SUW-Budowa ogrodzenia terenu stacji uzdatniania wody z bramami wjazdowymi (w tym bramy i furtki)-Budowa studzienki neutralizatora podchlorynu sodu-Wymianę pomp głębinowych w studniach: S1, S2, S3bis i S4 wraz z przebudową obudów studni wierconych i wymianą rozdzielnic elektrycznych oraz wymiana pomp głębinowych w studniach S-6, S-7 (wraz z 4 szafkami sterowniczymi)-Budowa przepustu drogowego2.Nadzór inwestorski3.Promocja projektu. (Polish)
    0 references
    The main objective of the project is to increase the number of people using high-quality water supply services in the area of the Municipality of Pruchnik.Products of the project: Number of water treatment plants supported – 1 pcs. The output will be achieved at the end of the investment – Q1 2021Project results: Number of additional persons benefiting from improved water supply – 7237 persons; Daily capacity of rebuilt water intakes – 1500 m³/day. The results will be achieved at the end of the investment – Q1 2021Scope of rzeczowy:1.Roboty construction-SUW in Hawłowice-Construction of the building of a water treatment plant with technological and sanitary installation with a capacity of Qh max.= 100 m³/h;-Demolition of the existing building of a water treatment station-Construction of roads, parking square and pavement pavement on the site of the SUW-Construction of equalisation tanks of treated water with a capacity of V=2x150 m³-Demolition of the existing pure water reinforced concrete tank with a capacity of V=50 m³-Construction at the water treatment station, pressure water supply networks-Construction of water treatment stations, gravitational sewage and sewerage connections and sewerage wells-Construction of a non-waste water tank with a capacity V=4,0 m³-Reconstruction of the “Park” pond-Building of a wash detacher with sewage connections and installation for drainage of overcharge water-Construction of the electrical and control system in the building of the water treatment plant-Construction power and control network in the SUW – Construction of the lighting network in the area of the SUW-Construction of the fence of the area of the water treatment station with entrance gates (including gates and gates)-Construction of sodium hypochlorite neutraliser wells-Replacement of submersible pumps in wells: S1, S2, S3bis and S4 with reconstruction of well housings and replacement of electrical switchgear and replacement of submersible pumps in wells S-6, S-7 (including 4 control cabinets)-Construction of the road culvert2.Investor supervision3.Promotion of the project. (English)
    8 July 2021
    0 references

    Identifiers

    RPPK.04.03.02-18-0060/18
    0 references