Requalification of the Orlando Ribeiro Municipal Library (Q2880635)

From EU Knowledge Graph
Revision as of 12:12, 13 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2880635 in Portugal
Language Label Description Also known as
English
Requalification of the Orlando Ribeiro Municipal Library
Project Q2880635 in Portugal

    Statements

    0 references
    76,619.32 Euro
    0 references
    1 July 2020
    0 references
    31 December 2022
    0 references
    MUNICIPIO DE LISBOA
    0 references
    0 references

    38°46'16.79"N, 9°9'49.57"W
    0 references
    As medidas de eficiência energética incluem a otimização do desempenho térmico da cobertura e dos vãos envidraçados, intervenção no sistema de iluminação, substituição das UTAN e das bombas de calor, e instalação de sistema solar fotovoltaico. A redução global do consumo da energia é de 45,4%, A redução global das emissões de CO2 é de 45,4%. A classe de eficiência energética do edifício antes de intervenção é o C e após intervenção será o B. (Portuguese)
    0 references
    Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B. (English)
    7 July 2021
    0 references
    Lisboa, Lumiar
    0 references

    Identifiers

    LISBOA-03-1203-FEDER-000109
    0 references