THERMOMODERNISATION OF THE BUILDING OF THE MUNICIPAL OFFICE MAINLY AT UL. LOUISE NORBLINA 1 (Q2702282)

From EU Knowledge Graph
Revision as of 01:17, 26 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2702282 in Poland
Language Label Description Also known as
English
THERMOMODERNISATION OF THE BUILDING OF THE MUNICIPAL OFFICE MAINLY AT UL. LOUISE NORBLINA 1
Project Q2702282 in Poland

    Statements

    0 references
    765,482.46 zloty
    0 references
    170,166.75 Euro
    0.2223 Euro
    0 references
    900,567.6 zloty
    0 references
    200,196.18 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    31 May 2021
    0 references
    29 October 2021
    0 references
    GMINA MIASTA GŁOWNO
    0 references
    0 references

    51°57'44.6"N, 19°42'42.1"E
    0 references
    Przedmiotem projektu jest głęboka modernizacja energetyczna budynku Urzędu Miejskiego w Głownie mająca na celu zwiększenie efektywności energetycznej obiektu, a tym samym likwidacji wszystkich związanych z tym problemów.Zakres obejmuje także opracowanie dok. technicznej, audytu energ. (wyd. niekwalifikowalny -dalej: nkw), oraz dok. aplikacyjnej (studium wykonalności wraz z wnioskiem o dofinansowanie i załączn. nr 4 i 15(nkw)), nadzór inwestorski (nkw), oraz działania informacyjno-promocyjne(nkw).Termomodernizacja (częściowo niekwalifikowalna) przewiduje docieplenie ścian piwnic i ścian fundamentowych, ścian zewn., termomodernizację stropu stropodachu, wymianę okien drewnianych i aluminiowych, wymianę zabudów otworów okiennych piwnic na okna oraz drzwi stalowych wsypu węgla na okno. Prace obejmują również wymianę instalacji c.o. wraz z grzejnikami oraz montaż nowych urządzeń kotłowni wraz z kotłami gazowymi i instalacji zewnętrznej oraz wewnętrznej gazu ziemnego.W ramach termomodernizacji obiektu przewiduje się realizację prac towarzyszących, niezbędnych do wykonania prac termomodernizacyjnych oraz prac remontowych wynikających z audytu energetycznego. Celem głównym projektu jest zwiększenie efektywności energetycznej budynku Urzędu Miejskiego w Głownie poprzez głębokie i kompleksowe działania termomodernizacyjne. Cel ten zostanie osiągnięty poprzez realizację celów szczegółowych: - Ograniczenie strat ciepła przez przenikanie w budynku, poprzez zwiększenie izolacyjności przegród budowlanych oraz wymianę stolarki okiennej, - Poprawa stanu technicznego infrastruktury energetycznej poprzez modernizację i podniesienie sprawności systemu grzewczego, - Zwiększenie komfortu cieplnego oraz warunków przebywania w budynku. Beneficjentami projektu będą osoby korzystające z budynku: pracownicy Urzędu Miejskiego, oraz pozostałe podmioty mieszczące się w obiekcie przy ul. Norblina 1. Pośrednio odbiorcami projektu będą wszyscy mieszkańcy Gminy Miasta Głowno. (Polish)
    0 references
    The subject of the project is a deep energy modernisation of the building of the Municipal Office in Głowno, aimed at increasing the energy efficiency of the facility and thus eliminating all the problems associated with it. The scope also includes the development of technical docs, energy audit. (ineligible version – hereinafter referred to as: NKW), as well as application docs (feasibility study together with the application for co-financing and attachments no. 4 and 15(NKW)), investor supervision (NKW), and information and promotion activities (NKW).Termomodernisation (partly ineligible) provides for warming of basement walls and foundation walls, external walls, thermomodernisation of the ceiling ceilings, replacement of wooden and aluminium windows, replacement of window openings of cellars for windows and steel doors of coal in the window. The works also include the replacement of central heating installations together with radiators and the installation of new boilers, gas boilers and external and internal natural gas installations. As part of the thermal modernisation of the facility, it is planned to carry out accompanying works necessary to perform thermomodernisation and renovation works resulting from the energy audit. The main objective of the project is to increase the energy efficiency of the building of the Municipal Office in Glowno through deep and comprehensive thermomodernisation activities. This objective will be achieved through the achievement of the specific objectives: — Reducing heat losses by penetrating the building by increasing the insulation of building partitions and replacing window joinery, – Improving the technical condition of the energy infrastructure by modernising and improving the efficiency of the heating system, – Increase the thermal comfort and living conditions in the building. The beneficiaries of the project will be persons using the building: employees of the City Hall, as well as other entities located in the building at ul. Norblin 1. Indirectly, all residents of the Municipality of Głowno will be the recipients of the project. (English)
    7 July 2021
    0 references

    Identifiers

    RPLD.04.02.01-10-0005/20
    0 references