Requalification of the Schools of the 1st Cycle of Basic and Childhood Gardens of Portalegre – 1st. Phase (Q2862673)

From EU Knowledge Graph
Revision as of 13:36, 6 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2862673 in Portugal
Language Label Description Also known as
English
Requalification of the Schools of the 1st Cycle of Basic and Childhood Gardens of Portalegre – 1st. Phase
Project Q2862673 in Portugal

    Statements

    0 references
    23,586.48 Euro
    0 references
    85.0 percent
    0 references
    1 June 2016
    0 references
    31 December 2017
    0 references
    MUNICIPIO DE PORTALEGRE
    0 references
    A operação contempla a substituição das coberturas da EB1/JI do Atalaião e da EB1/JI dos Assentos, as quais são constituídas por chapas de fibrocimento, que apresentam alguns sinais de degradação, pondo em causa, a médio prazo, a saúde pública infantil.A intervenção assume um carácter excepcional e prioritário, tanto mais que se trata de dois dos maiores estabelecimentos de ensino do Concelho de Portalegre e, consequentemente, (Portuguese)
    0 references
    The operation contemplates the replacement of the EB1/JI coverings of Atalaião and EB1/JI of the coxies, which are made up of fibrocement plates, which show some signs of degradation, calling into question, in the medium term, the public health of children.The intervention takes on an exceptional and priority character, especially since it is two of the largest educational establishments in the municipality of Portalegre and, consequently, (English)
    6 July 2021
    0 references
    Portalegre, União das freguesias da Sé e São Lourenço
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000007
    0 references