Pages that link to "Item:Q4404014"
Jump to navigation
Jump to search
The following pages link to Strengthening the regional competitiveness of SMEs (Q4404014):
Displayed 50 items.
- Hall extension and machinery and equipment (Q6872009) (← links)
- Investment in new machinery (Q6872012) (← links)
- Purchase of machines and tools for series production of new developments (Q6872013) (← links)
- Extension of operation including technical equipment (Q6872015) (← links)
- Flexible re-cutting circular saw and new, expanded timber sorting (Q6872027) (← links)
- Establishment of a permanent establishment (Q6872029) (← links)
- Investment in a plant for the production of load-bearing components (Q6872033) (← links)
- Expansion of the company through mechanical and structural investments (Q6872036) (← links)
- Optimisation of the production process and introduction of new products (Q6872037) (← links)
- ESTET 2020: Investment Plan (Q6872038) (← links)
- Technology expansion by printing press (Q6872040) (← links)
- Etivera Innovation Park (Q6872042) (← links)
- Explorer No. 9 (Q6872048) (← links)
- Refurbishment and assembly (Q6872061) (← links)
- Refurbishment and assembly (Q6872068) (← links)
- Investments to further deepen the value chain (Q6872072) (← links)
- Expansion of the recirculation plant including automation of the same (Q6872074) (← links)
- INHo Industrialisation in Building Construction 2020 (Q6872075) (← links)
- Construction of an additional production site in Herzogsdorf (Q6872085) (← links)
- Bisy RC hofstaetten (Q6872089) (← links)
- CNC Universal Bed Milling and Drilling Center (Q6872090) (← links)
- Establishment of a 3 star hotel in Bad Kleinkirchheim (Q6872091) (← links)
- Introduction of new production technologies and Industry 4.0 (Q6872096) (← links)
- Fermentation and storage cellar with 12 beer storage tanks and extension of the bottle hall (Q6872100) (← links)
- Bottle filling system incl. auxiliary systems including installation and techn. connection (Q6872101) (← links)
- Construction Sudhaus with Gärkeller with machine equipment (Q6872102) (← links)
- New filling plant (Q6872103) (← links)
- Addition of bottle hall and modernisation of the filling line (Q6872104) (← links)
- Buildings with plants for distillation of plant material and storage areas for essential oils (Q6872114) (← links)
- Purchase of an 8-colour offset printing machine to expand the product range (Q6872120) (← links)
- UIG 2021: build! Implementation of innovative start-up projects (Q6872122) (← links)
- Construction Production hall joinery, purchase of new machines (Q6872123) (← links)
- Capacity expansion & resource efficiency at the production site Marchtrenk (Q6872127) (← links)
- Modernisation and expansion of the machinery by turning with driven tools, outdoors (Q6872129) (← links)
- Investing in an autoclave to produce new and innovative products (Q6872130) (← links)
- Expansion and expansion of machining spectrum (Q6872137) (← links)
- Capacity expansion in the machining process, installation of an automated warehouse (Q6872139) (← links)
- Tool and plant maintenance in-house (Q6872142) (← links)
- Purchase of a new high-pressure waterjet cutting plant (Q6872143) (← links)
- Construction of a new pellet production plant (Q6872144) (← links)
- Addition of an accommodation area to the wine hotel “Kirchenwirt Gols” (Q6872147) (← links)
- Investment 2020/21 (Q6872150) (← links)
- Production hall including office wing, machines, furnishing, IT (Q6872151) (← links)
- Construction of an operational building including equipment as well as mechanical investments (Q6872152) (← links)
- New construction and development center, assembly and storage hall (Q6872153) (← links)
- Establishment of a new permanent establishment (Q6872154) (← links)
- Expansion of production areas and acquisition of a CNC-BAZ (Q6872156) (← links)
- Investment quality (Q6872162) (← links)
- Purchase of an automatic trimming system including structural adaptations for their installation (Q6872176) (← links)
- To/construction (Q6872177) (← links)