Pages that link to "Item:Q4406114"
Jump to navigation
Jump to search
The following pages link to Energy Efficiency and Mobility (Q4406114):
Displayed 50 items.
- Energy Efficiency in Public Lighting in the Municipality of Chamusca – Technical Study and Evaluation (Q2866089) (← links)
- Energy Efficiency in the Public Lighting of Ponte de Sor – Complementary – ALT20-07-1203-FEDER-000041 (Q2866090) (← links)
- Improvement of thermal behavior and energy efficiency of the Municipal Library of Sousel – Complementary Application (Q2866091) (← links)
- Improvement of Energy Efficiency in the Municipal Garden of Elvas – “Complementary Application” (Q2866092) (← links)
- Improvement of Energy Efficiency in the Building of the Cultural Center of Arronches – Complementary Application (Q2866093) (← links)
- Energy Efficiency in the Public Lighting of the Municipality of Arronches- Jardim do Fosso – Complementary Application (Q2866094) (← links)
- Energy Efficiency in Municipal Pools – “Complementary Application” (Q2866095) (← links)
- Improvement of energy efficiency of municipal equipment – Municipal Library – Complementary (Q2866096) (← links)
- Improvement of energy efficiency of municipal equipment – Municipal Garden Lighting – Complementary (Q2866097) (← links)
- Energy Efficiency of the Municipality of Viana do Alentejo – Studies (complementary 084 and 085) (Q2866098) (← links)
- Energy Efficiency – Municipal Pools of Benavente and Samora Correia – Audits and Studies (Q2866099) (← links)
- Acquisition and Installation of Efficient Public Lighting Equipment – Phase 2 (Q2866100) (← links)
- Acquisition and Installation of Efficient Public Lighting Equipment – Evaluation Audits (Q2866101) (← links)
- 2 rd phase of intervention in public lighting systems in Benavente, Samora Correia, Barrosa and Santo Estêvão, to improve energy efficiency in the municipality of Benavente (Q2866103) (← links)
- Energy efficiency in public lighting (phase 2) – Studies and reports (Q2866105) (← links)
- Improving the Energy Efficiency of the Alter do Chão Gimnodesportivo Pavilion (Q2866106) (← links)
- Improvement of Energy Efficiency of the Gimnodesportivo Pavilion of Alter do Chão – Complementary Application (Q2866107) (← links)
- Energy Efficiency Rio Maior – Public Lighting Equipment – Phase 2 (Q2866108) (← links)
- Energy Efficiency – Efficient Public Lighting in the municipality of Azambuja – Phase II (Q2866109) (← links)
- Energy Efficiency in the Public Lighting of the Municipality of Coruche – Phase 2 (Q2866110) (← links)
- Energy Efficiency in the Public and Decorative Lighting of the Alter do Chão Council (Q2866111) (← links)
- 3 rd phase of intervention in the public lighting systems of Benavente, Samora Correia and Santo Estêvão, to improve the energy efficiency of the municipality of Benavente (Q2866112) (← links)
- Energy Efficiency in Public Lighting (Phase 3) – Studies and Reports (Q2866113) (← links)
- Remodeling of the Public Lighting of the Historical Centre – complementary (Q2866114) (← links)
- Remodeling of the Public Lighting of the Historical Center – main (Q2866115) (← links)
- Energy Efficiency of the Municipality of Coruche – Phase 3 – Intangible Measures (Q2866116) (← links)
- Rehabilitation of the Social Freguesia of Cunheira – Energy Efficiency (Q2866117) (← links)
- Pamus – Multimodal Toll Square (Q2866118) (← links)
- Requalification of the old E.N.369 at the south entrance of Alter do Chão and roundabout construction at the junction for Head of Vide (Q2866119) (← links)
- Prepare Monforte: Actions 1, 2, 3, 4 and 6 (Q2866120) (← links)
- Valorisation of the Entrada de Castelo de Vide, Martinho/S.José- Pedonal Corridors (Q2866121) (← links)
- Urban Rehabilitation of Vila de Redondo: Unit C – Phase 2 (Q2866122) (← links)
- Pedestrian circuit between the urban núcelo of Fronteira and the Ecotouristic Center of Ribeira Grande (Q2866123) (← links)
- AVIS/CLUB CONNECTION CYCLING AND PEDESTRIAN CORRIDOR (PHASE A) (Q2866124) (← links)
- Requalification of the Public Space of the Historical Center of Alcáçovas (Q2866125) (← links)
- Construction of stops for public transport (Q2866126) (← links)
- Improvement of mobility and pedestrian accessibility on Estrada da Circunvalação, Rua Dr. Egas Moniz, Rua 1º de Maio and Rua do Norte. (Q2866127) (← links)
- Urban requalification involving the Games Fields and Cruise of Lapa (Q2866128) (← links)
- Construction of pedestrian roads in EN 367, urban area of Marinhais, section between Estrada Militar and EN 118 (Q2866129) (← links)
- Requalification of Azinhaga do Moinho de Vento e Largo de Santa Catarina in Alter do Chão (Q2866130) (← links)
- Requalification of North Access and Southern Access of Chança Cluster (Q2866131) (← links)
- Urban Rehabilitation of Vila de Redondo: Unit B (Q2866132) (← links)
- Pamus – Pawn route between the Fountain of Pipa and the Rodão Gates (Q2866133) (← links)
- Remodeling of Infrastructure and Paving Networks – Rua do Penedo, Alvito (Q2866134) (← links)
- Sousel Urban Park (Q2866135) (← links)
- Improvement of Mobility in the Pinhal Industrial Area of Mouros/EN 114.3, in Salvaterra de Magos (Q2866136) (← links)
- MUSFA – Sustainable Urban Mobility of Ferreira do Alentejo – Phase I (Q2866137) (← links)
- Build/requalify the pedestrian network – connection of the parish of Barreta to public equipment (Q2866138) (← links)
- Requalification of Lagoa Street – Fronteira (Q2866139) (← links)
- Improvement of Urban Mobility and Road Safety of the Municipality of Alandroal – 1st Phase (Q2866140) (← links)