Design the design documentation for the establishment of the Centre for Advanced Materials and Materials (Q2727843): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Removed claim: intervention field (P888): Preparation, implementation, monitoring and inspection (Q200762), Removing category of intervention) |
||
Property / intervention field | |||
Property / intervention field: Preparation, implementation, monitoring and inspection / rank | |||
Revision as of 11:40, 8 June 2021
Project Q2727843 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Design the design documentation for the establishment of the Centre for Advanced Materials and Materials |
Project Q2727843 in Croatia |
Statements
1,133,621.43 Croatian kuna
0 references
1,333,672.28 Croatian kuna
0 references
85.0 percent
0 references
29 June 2020
0 references
29 June 2022
0 references
SVEUČILIŠTE U ZAGREBU, FAKULTET STROJARSTVA I BRODOGRADNJE
0 references
10000
0 references
Ovim projektom se predviđa izrada projektne dokumentacije za rekonstrukciju postojećih prostora Zavoda za materijale FSBa u cilju stvaranja infrastrukturnih preduvjeta za realizaciju IRI Centra za napredne materijale i prevlake. Najznačajniji doprinos projekta je u dogradnji objekata na postojeću zgradu u ukupnoj površini od 631 m2. U novim prostorima će biti smješteni laboratoriji s opremom za dizajniranje, izradu i ispitivanje naprednih materijala i prevlaka čime će se omogućiti istraživanja vrhunske kvalitete na području Inženjerstva materijala. Realizacija projekta osnivanja Centra predlaže se kroz 2 faze: izradu projektne dokumentacije te rekonstrukcija i dogradnja nove IRI infrastrukture FSB-a. (Croatian)
0 references
This project provides for design documentation for the reconstruction of existing Institute premises for FSBa materials with the aim of creating infrastructure conditions for the realisation of the R & D & R & D & I (IRI) Centre. The most significant contribution of the project is to upgrade the premises to an existing building in a total area of 631 m². The new premises will host laboratories equipped with the design, design and testing of advanced materials and coatings, enabling world-class quality research in the domain of materials. The realisation of the project is proposed through 2 phases: the design of the project documentation and the reconstruction and upgrade of the new FSB infrastructure IRI. (English)
3 June 2021
0 references
Identifiers
KK.01.1.1.09.0017
0 references