Q2734545 (Q2734545): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): A recycling yard will be built to meet the needs of the town of goldsmiths ‘city’, i.e. 19 settlements within the City of: Blec, Borkovec, Cetinovec, Lower Batina, Lower Selnica, Upper Selnica, Juranščina, Ladislav čričec, Martinšččina, Peroševec, Rattkovec, Repni, Ščirbovc, Final Belko, Zlaptar, Znož for a total of 6096 inhabitants, for the purposes of systematic waste management and environmental protection. Construction will ensure a separate...)
Property / summary
 
A recycling yard will be built to meet the needs of the town of goldsmiths ‘city’, i.e. 19 settlements within the City of: Blec, Borkovec, Cetinovec, Lower Batina, Lower Selnica, Upper Selnica, Juranščina, Ladislav čričec, Martinšččina, Peroševec, Rattkovec, Repni, Ščirbovc, Final Belko, Zlaptar, Znož for a total of 6096 inhabitants, for the purposes of systematic waste management and environmental protection. Construction will ensure a separate collection of raw materials, use of waste and reduce the amount of waste landfilled. The project results were built and equipped with a recycling yard, 4572 inhabitants, i.e. 75 % of the total in 19, and 35 tonnes of waste are expected to be deposited in one year. (English)
Property / summary: A recycling yard will be built to meet the needs of the town of goldsmiths ‘city’, i.e. 19 settlements within the City of: Blec, Borkovec, Cetinovec, Lower Batina, Lower Selnica, Upper Selnica, Juranščina, Ladislav čričec, Martinšččina, Peroševec, Rattkovec, Repni, Ščirbovc, Final Belko, Zlaptar, Znož for a total of 6096 inhabitants, for the purposes of systematic waste management and environmental protection. Construction will ensure a separate collection of raw materials, use of waste and reduce the amount of waste landfilled. The project results were built and equipped with a recycling yard, 4572 inhabitants, i.e. 75 % of the total in 19, and 35 tonnes of waste are expected to be deposited in one year. (English) / rank
 
Normal rank
Property / summary: A recycling yard will be built to meet the needs of the town of goldsmiths ‘city’, i.e. 19 settlements within the City of: Blec, Borkovec, Cetinovec, Lower Batina, Lower Selnica, Upper Selnica, Juranščina, Ladislav čričec, Martinšččina, Peroševec, Rattkovec, Repni, Ščirbovc, Final Belko, Zlaptar, Znož for a total of 6096 inhabitants, for the purposes of systematic waste management and environmental protection. Construction will ensure a separate collection of raw materials, use of waste and reduce the amount of waste landfilled. The project results were built and equipped with a recycling yard, 4572 inhabitants, i.e. 75 % of the total in 19, and 35 tonnes of waste are expected to be deposited in one year. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:19, 3 June 2021

Project Q2734545 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2734545 in Croatia

    Statements

    0 references
    3,706,619.83 Croatian kuna
    0 references
    481,860.58 Euro
    2 June 2021
    0 references
    4,360,729.22 Croatian kuna
    0 references
    566,894.8 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    28 October 2020
    0 references
    28 October 2022
    0 references
    GRAD ZLATAR
    0 references
    0 references

    45°28'35.76"N, 13°46'15.10"E
    0 references
    49250
    0 references
    Reciklažno dvorište će se izgraditi za potrebe Grada Zlatara, odnosno 19 naselja unutar Grada: Belec, Borkovec, Cetinovec, Donja Batina, Donja Selnica, Ervenik Zlatarski, Gornja Batina, Gornja Selnica, Juranščina, Ladislavec, Martinščina, Petruševec, Ratkovec, Repno, Ščrbinec, Vižanovec, Završje Belečko, Zlatar, Znož za ukupno 6096 stanovnika, u svrhu sustavnog gospodarenja otpadom i zaštite okoliša. Izgradnjom će se osigurati zasebno prikupljanje sirovina, korištenje otpada te smanjenje količine otpada odloženog na odlagalište. Rezultati projekta su izgrađeno i opremljeno reciklažno dvorište, informirano 4572 stanovnika, tj. 75% od ukupnog broja u 19 naselja kroz edukativne aktivnosti te se očekuje odlaganje 35 tona otpada u godini dana. (Croatian)
    0 references
    A recycling yard will be built to meet the needs of the town of goldsmiths ‘city’, i.e. 19 settlements within the City of: Blec, Borkovec, Cetinovec, Lower Batina, Lower Selnica, Upper Selnica, Juranščina, Ladislav čričec, Martinšččina, Peroševec, Rattkovec, Repni, Ščirbovc, Final Belko, Zlaptar, Znož for a total of 6096 inhabitants, for the purposes of systematic waste management and environmental protection. Construction will ensure a separate collection of raw materials, use of waste and reduce the amount of waste landfilled. The project results were built and equipped with a recycling yard, 4572 inhabitants, i.e. 75 % of the total in 19, and 35 tonnes of waste are expected to be deposited in one year. (English)
    3 June 2021
    0 references

    Identifiers

    KK.06.3.1.16.0052
    0 references