Q2733145 (Q2733145): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f), translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f) (English) | |||||||||||||||
Property / summary: The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f) (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f) (English) / qualifier | |||||||||||||||
point in time: 3 June 2021
|
Revision as of 12:54, 3 June 2021
Project Q2733145 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2733145 in Croatia |
Statements
803,775.76 Croatian kuna
0 references
1,354,098.0 Croatian kuna
0 references
85.0 percent
0 references
4 October 2018
0 references
4 February 2022
0 references
OSNOVNA ŠKOLA ČAZMA
0 references
43240
0 references
Projektom je predviđeno ostvarenje uštede godišnje potrebne energije za grijanje od 52,66 % što se postiže s: a) Sanacija krova, b) Izolacija vanjskog zida grijanog prostora fasadnjm sustavom, c) Projektom je predviđeno uklanjanje postojećih slojeva poda i postava toplinske izolacije poda, d) zamjena drvene stolarije novom PVC stolarijom e) zamjena sustava grijanja f) gromobranska izolacija (Croatian)
0 references
The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f) (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0358
0 references