Q2733110 (Q2733110): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The project is planned with energy renovation covering four construction measures for improving the thermal protective envelope (walls on the building side, ceiling to attic, ceiling hair roof, replacement of external joinery), and four engine engineering measures (reconstruction of the heating system, installation of thermostatic valves and installation of solar collectors for hot water generation, and metering and water separation), with a vie...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is planned with energy renovation covering four construction measures for improving the thermal protective envelope (walls on the building side, ceiling to attic, ceiling hair roof, replacement of external joinery), and four engine engineering measures (reconstruction of the heating system, installation of thermostatic valves and installation of solar collectors for hot water generation, and metering and water separation), with a view to reducing energy input and harmful CO2 emissions. (English) | |||||||||||||||
Property / summary: The project is planned with energy renovation covering four construction measures for improving the thermal protective envelope (walls on the building side, ceiling to attic, ceiling hair roof, replacement of external joinery), and four engine engineering measures (reconstruction of the heating system, installation of thermostatic valves and installation of solar collectors for hot water generation, and metering and water separation), with a view to reducing energy input and harmful CO2 emissions. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is planned with energy renovation covering four construction measures for improving the thermal protective envelope (walls on the building side, ceiling to attic, ceiling hair roof, replacement of external joinery), and four engine engineering measures (reconstruction of the heating system, installation of thermostatic valves and installation of solar collectors for hot water generation, and metering and water separation), with a view to reducing energy input and harmful CO2 emissions. (English) / qualifier | |||||||||||||||
point in time: 3 June 2021
|
Revision as of 12:53, 3 June 2021
Project Q2733110 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2733110 in Croatia |
Statements
819,485.75 Croatian kuna
0 references
1,344,727.5 Croatian kuna
0 references
85.0 percent
0 references
16 October 2018
0 references
16 October 2020
0 references
VIROVITIČKO-PODRAVSKA ŽUPANIJA
0 references
33000
0 references
Projektom je planirana energetska obnova koja obuhvaća četiri građevinske mjere za poboljšanje toplinske zaštitne ovojnice (zidovi na pročelju zgrade, strop prema tavanu, strop-kosi krov, te zamjenu vanjske stolarije), te četiri strojarske mjere (rekonstrukciju sustava grijanja, ugradnje termostatskih ventila te postavljanje solarnih kolektora za pripremu tople vode, te razdvajanje mjerenja - vode i struje) a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
0 references
The project is planned with energy renovation covering four construction measures for improving the thermal protective envelope (walls on the building side, ceiling to attic, ceiling hair roof, replacement of external joinery), and four engine engineering measures (reconstruction of the heating system, installation of thermostatic valves and installation of solar collectors for hot water generation, and metering and water separation), with a view to reducing energy input and harmful CO2 emissions. (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0303
0 references