Q2660665 (Q2660665): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): In the feasibility study, Netport Science Park will assess what conditions should be met by a delimited electric road pilot on the E22 and which road section is suitable. In the feasibility study, local business will be involved through interviews and workshops. With the help of surveys, calculations and consultations, the goal of the project will be achieved. Stakeholders will be interviewed where relevant issues will be addressed. The results...)
Property / summary
 
In the feasibility study, Netport Science Park will assess what conditions should be met by a delimited electric road pilot on the E22 and which road section is suitable. In the feasibility study, local business will be involved through interviews and workshops. With the help of surveys, calculations and consultations, the goal of the project will be achieved. Stakeholders will be interviewed where relevant issues will be addressed. The results of the feasibility study must clarify whether there are conditions for a possible electric road pilot that meets the requirements and criteria to proceed with an implementation project to develop a plan for the realisation of an electric road pilot. In the long term, the project is expected to lead to a fossil-free transport system through electrification of heavy transport. (English)
Property / summary: In the feasibility study, Netport Science Park will assess what conditions should be met by a delimited electric road pilot on the E22 and which road section is suitable. In the feasibility study, local business will be involved through interviews and workshops. With the help of surveys, calculations and consultations, the goal of the project will be achieved. Stakeholders will be interviewed where relevant issues will be addressed. The results of the feasibility study must clarify whether there are conditions for a possible electric road pilot that meets the requirements and criteria to proceed with an implementation project to develop a plan for the realisation of an electric road pilot. In the long term, the project is expected to lead to a fossil-free transport system through electrification of heavy transport. (English) / rank
 
Normal rank
Property / summary: In the feasibility study, Netport Science Park will assess what conditions should be met by a delimited electric road pilot on the E22 and which road section is suitable. In the feasibility study, local business will be involved through interviews and workshops. With the help of surveys, calculations and consultations, the goal of the project will be achieved. Stakeholders will be interviewed where relevant issues will be addressed. The results of the feasibility study must clarify whether there are conditions for a possible electric road pilot that meets the requirements and criteria to proceed with an implementation project to develop a plan for the realisation of an electric road pilot. In the long term, the project is expected to lead to a fossil-free transport system through electrification of heavy transport. (English) / qualifier
 
point in time: 29 April 2021
Timestamp+2021-04-29T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:00, 29 April 2021

No description defined
Language Label Description Also known as
English
No label defined
No description defined

    Statements

    0 references
    400,000.0 Swedish krona
    0 references
    39,600.0 Euro
    28 April 2021
    0 references
    800,000.0 Swedish krona
    0 references
    79,200.0 Euro
    28 April 2021
    0 references
    0.5 percent
    0 references
    16 May 2018
    0 references
    15 February 2019
    0 references
    Netport Science Park AB (Svb)
    0 references
    37435
    0 references
    I förstudien ska Netport Science Park bedöma vilka förutsättningar som bör uppfyllas av en avgränsad elvägspilot på E22 och vilket vägavsnitt som lämpar sig. I förstudien kommer det lokala näringslivet involveras genom intervjuer och workshops. Med hjälp utav kartläggningar, beräkningar och konsultationer kommer projektets mål att nås. Intressenter kommer att intervjuas där relevanta frågeställningar kommer att tas upp. Resultatet av förstudien ska klargöra om det finns förutsättningar för en möjlig elvägspilot som uppfyller krav och kriterier för att gå vidare med ett genomförandeprojekt för att ta fram en plan för realisering av en elvägspilot. På sikt förväntas projektet leda till ett fossilfritt transportsystem genom elektrifiering av tunga transporter. (Swedish)
    0 references
    In the feasibility study, Netport Science Park will assess what conditions should be met by a delimited electric road pilot on the E22 and which road section is suitable. In the feasibility study, local business will be involved through interviews and workshops. With the help of surveys, calculations and consultations, the goal of the project will be achieved. Stakeholders will be interviewed where relevant issues will be addressed. The results of the feasibility study must clarify whether there are conditions for a possible electric road pilot that meets the requirements and criteria to proceed with an implementation project to develop a plan for the realisation of an electric road pilot. In the long term, the project is expected to lead to a fossil-free transport system through electrification of heavy transport. (English)
    29 April 2021
    0 references

    Identifiers

    20201703
    0 references