(A19_093_2016_0930060_1059) EFFICIENCY HOTEL HOTEL (Q2066486): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q2501112 was merged with Q291671)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 11:26, 29 December 2020

Project Q2066486 in Italy
Language Label Description Also known as
English
(A19_093_2016_0930060_1059) EFFICIENCY HOTEL HOTEL
Project Q2066486 in Italy

    Statements

    0 references
    17,163.17 Euro
    0 references
    34,326.34 Euro
    0 references
    50.0 percent
    0 references
    29 July 2016
    0 references
    29 July 2018
    0 references
    29 July 2018
    0 references
    HOTEL RISTORANTE GIARDINO DI AMOROSI EVA E C. S.N.C.
    0 references
    0 references
    0 references

    43°41'43.98"N, 11°49'2.42"E
    0 references
    IL PROGETTO SI SVILUPPA SU UN FABBRICATO AD USO RICETTIVO CON ATTIVITA DI ALBERGO FIN DALLA SUA COSTRUZIONE NEGLI ANNI ?70 DEL SECOLO SCORSO. DALLA SUA COSTRUZIONE AD OGGI NESSUN INTERVENTO VOLTO A MIGLIORARE LE PRESTAZIONI ENERGETICHE DELL'EDIFICIO E STATO EFFETTUATO, PERTANTO SI E RESO NECESSARIO ADEGUARE LA STRUTTURA A STANDARD PIU MODERNI DI EFFICIENZA. L'INTERVENTO PER IL QUALE SI FA DOMANDA DI AIUTO SU QUESTO BANDO RIGUARDA 3 AZIONI DISTINTE: TETTO: IL MANTO DI COPERTURA E DEL TIPO TRAVETTI IN CA AD INTERASSE 90 CM, CON TABELLA DA 6 CM MARSIGLIESI IN COTTO. LE STRUTTURE PORTANTI SONO IN MISTO PIETRAME PER PRIMO PIANO, BOZZE DI TUTO PER IL PIANO SECONDO E LATERIZIO FORATO PER IL PIANO TERZO. VERRA EFFETTUATO UN INTERVENTO VOLTO ALLA COIBENTAZIONE DEL MANTO DI COPERTURA PER IL TETTO NON E STATO POSSIBILE AVERE UN PREVENTIVO PER L'INTERVENTO, NON SARA QUINDI RICHIESTO ALCUN CONTRIBUTO PER QUESTA AZIONE. INFISSI: GLI INFISSI AD OGGI SONO IN METALLO ALLUMINIO CON VETRO CAMERA, VERRANN (Italian)
    0 references
    THE PROJECT IS DEVELOPING ON A HOSPITALITY BUILDING WITH A HOTEL ACTIVITY SINCE IT WAS BUILT IN THE YEARS? 70 OF THE LAST CENTURY. SINCE ITS CONSTRUCTION TO DATE, NO ACTION HAS BEEN TAKEN TO IMPROVE THE ENERGY PERFORMANCE OF THE BUILDING AND THE STATE, SO IT HAS BECOME NECESSARY TO ADAPT THE STRUCTURE TO MORE MODERN EFFICIENCY STANDARDS. THE AID APPLICATION FOR THIS CALL FOR TENDERS CONCERNS 3 SEPARATE ACTIONS: ROOF: THE COVERING COVER AND THE TYPE OF COVER IN CA 90 CM WITH A DISTANCE BETWEEN 6 CM AND THE BAKED COVER. THE LOAD-BEARING STRUCTURES ARE IN THE FIRST FLOOR MIXED ROCK, WITH A COPY FOR THE SECOND AND A PHORATE PLANE FOR THE THIRD PLAN. AS THE ROOF COVERING THE ROOF COVERING THE ROOF AND THE STATE COULD NOT HAVE A PREVENTIVE MEASURE FOR THE OPERATION, THERE WILL BE NO INPUT FOR THIS ACTION. FRAMES: THE FIXTURES TO DATE ARE MADE OF ALUMINIUM METAL WITH GLASS OF THE CHAMBER, VERRANN (English)
    0 references

    Identifiers