Černíkov – construction of a pool (Q71788): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214257 was merged with Q4861) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 17:06, 27 December 2020
Project Q71788 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Černíkov – construction of a pool |
Project Q71788 in Czech Republic |
Statements
472,452.7 Czech koruna
0 references
472,452.7 Czech koruna
0 references
100 percent
0 references
31 August 2020
0 references
xxx
0 references
34506
0 references
Výstavba průtočné tůně napouštěné z hlavního odvodňovacího zařízení v nezastavěném území obce Černíkov na trvalém travním porostu a neplodné půdě. (Czech)
0 references
Construction of a flow pool loaded from the main drainage facility in the unbuilt area of the village Černíkov on permanent grassland and barren soil. (English)
23 October 2020
0 references
Identifiers
CZ.05.4.27/0.0/0.0/19_131/0010208
0 references