Water Supply All 3rd Stage (Q60149): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214255 was merged with Q4859) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 16:08, 27 December 2020
Project Q60149 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Water Supply All 3rd Stage |
Project Q60149 in Czech Republic |
Statements
1,686,314.45 Czech koruna
0 references
2,645,199.15 Czech koruna
0 references
63.75 percent
0 references
11 July 2017
0 references
28 February 2019
0 references
Obec Všenory
0 references
25231
0 references
Předmětem projektu je dokončení vodovodní sítě v obci Všenory. V minulosti byl v obci realizován vodovod na většině území, ale vzhledem k finanční náročností nepokryla akce celé území. V lokalitě, kde se má výstavba realizovat, není v době podání žádosti o dotaci žádný vodovod. Lidé na tomto úseku jsou zásobeny vodou z vlastních studen. Protože se obec nachází na příkrém svahu, dochází poměrně často ke znečištění vodních zdrojů díky přívalovým dešťům, které splavují nečistoty z celého okolí. (Czech)
0 references
The purpose of the project is to complete the water network in the village of Všenory. In the past, water supply was implemented in the village in most areas, but due to financial difficulties, the action did not cover the whole territory. There is no water supply in the area where the construction is to be carried out at the time of the application for the subsidy. People on this stretch are supplied with water from their own wells. Because the village is located on a steep slope, water resources are quite often contaminated due to torrential rains that drain dirt from all over the area. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/15_022/0001282
0 references