Project Q61205 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | WWTP and sewerage system Malovice and Malovičky |
Project Q61205 in Czech Republic |
Statements
16,865,251.2 Czech koruna
0 references
26,455,296.0 Czech koruna
0 references
63.75 percent
0 references
31 July 2021
0 references
Obec Malovice
0 references
38411
0 references
Stávající stav systému čištění odpadních vod v Malovicích a Malovičkách je nevyhovující. Čištění splašků probíhá v septicích a kanalizace je vyústěna do Malovického rybníka. Je navrženo vybudování nové ČOV (kapacita 400 EO) s podchycením stávajících volných výustí přes odlehčovací komory vybudované na stávávajících kanalizačních řadech. Propojení kanalizační sítě z Malovic do Maloviček bude zajištěno výtlačným řadem. Na projekt je vydáno SP s plánem nabytí právní moci 31.1.2018. (Czech)
0 references
The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English)