Expansion of DW 977 Gorlice – State border: Reconstruction of the bridge on the Sękówka creek in Sękowa (Q112966): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q2509341 was merged with Q2157)
Property / beneficiaryProperty / beneficiary

Revision as of 17:29, 26 December 2020

Project Q112966 in Poland
Language Label Description Also known as
English
Expansion of DW 977 Gorlice – State border: Reconstruction of the bridge on the Sękówka creek in Sękowa
Project Q112966 in Poland

    Statements

    0 references
    10,519,714.47 zloty
    0 references
    2,524,731.47 Euro
    13 January 2020
    0 references
    12,376,134.69 zloty
    0 references
    2,970,272.33 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2019
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO MAŁOPOLSKIE
    0 references
    Przedmiotem zamówienia jest budowa obiektu mostowego jednoprzęsłowego żelbetowego sprężonego na potoku Sękówka w ciągu drogi wojewódzkiej nr 977 wraz z budową 3 wlotowego skrzyżowania typu rondo po północnej stronie obiektu oraz budową ścieżki rowerowej.Główne parametry dla obiektu mostowego po rozbudowie klasa obciążeń A, klasa drogi w ciągu obiektu: G szerokość jezdni: min. 8,0 m 0,53,5 3,50,5 m; szerokość użytkowa ścieżki rowerowej: 2,0 m szerokość użytkowa chodnika: 2,0 m Obiekt projektowany będzie na klasę A obciążenia. Dodatkowo zostanie zaprojektowany na obciążenie pojazdem specjalnym STANAG 2012 klasy 150 zgodnie z rozporządzeniem Ministra Transportu i Gospodarki Morskiej z dnia 30 maja 2000r. w sprawie warunków technicznych jakim powinny odpowiadać drogowe obiekty inżynierskie i ich usytuowanie Dz. U. nr 63, poz. 735, z późn. zm..Obiekt mostowy zaprojektowany i wykonany jako obiekt żelbetowy sprężony jednoprzęsłowy z podporami zlokalizowanymi poza korytem rzeki. Na obiekcie zaprojektowany i wykonany zostanie obustronny chodnik dla pieszych o szer. 2m i ścieżką rowerową zgodnie z koncepcją.Wykonane zostaną wszelkie niezbędne opracowania pomocnicze m.in. rozpoznanie geotechniczne podłoża gruntowego, obliczenia hydraulicznohydrologiczne obiektów inżynierskich, zgodnie z obowiązującymi przepisami, wraz z uzyskaniem niezbędnych opinii, decyzji i uzgodnień. Budowa ronda obejmuje m.in. zmianę geometrii skrzyżowania, budowę i przebudowę odcinków chodników w rejonie przedmiotowego skrzyżowania spełniającymi wymagania parametrów drogi klasy G, prawidłowego odwodnienia oraz rozwiązania obsługi komunikacyjnej przyległego terenu w zakresie ruchu kołowego i pieszego. Po uzyskaniu decyzji ZRID Wykonawca zrealizuje prace budowlane niezbędne do uzyskania zakładanych produktów.Ciąg dalszy w punkcie Q. (Polish)
    0 references
    The object of the contract is the construction of a single-span bridge facility compressed on the Sękówka creek in the course of Voivodeship Road No.977 together with the construction of 3 inlet crossroads of type roundabout on the north side of the object and the construction of a bicycle path.The main parameters for the bridge object after the extension of the load class A, the road class within the facility: G width of the road: min. 8,0 m 0,53,5 3,50,5 m; usable width of the cycle path: 2,0 m useful width of the pavement: 2,0 m The facility will be designed for Class A load. In addition, it will be designed to load a special vehicle STANAG 2012 class 150 in accordance with the Regulation of the Minister of Transport and Maritime Economy of 30 May 2000 on technical conditions to be met by road engineering structures and their location Dz. U. No. 63, item. 735, with later amendments. Bridge object designed and constructed as a reinforced concrete single-span compressed object with supports located outside the riverbed. The building is designed and constructed on both sides of the pedestrian pavement. 2 m and bike path according to the concept.All necessary auxiliary studies will be carried out, among others, geotechnical recognition of the ground floor, hydraulic hydrological calculations of engineering facilities, in accordance with the applicable regulations, together with obtaining the necessary opinions, decisions and arrangements. The construction of the roundabout includes, among others, changing the geometry of intersections, construction and reconstruction of pavement sections in the area of this intersection meeting the requirements of the Class G road, proper drainage and the solution of the communication service of the adjacent area in the area of traffic and pedestrians. After obtaining the decision ZRID The Contractor will carry out the construction work necessary to obtain the intended products. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.07.01.01-12-0072/19
    0 references