“Regeneration of degraded areas of the Dzieżoni District – restoration of multi-family residential buildings” (Q96089): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed claim: beneficiary (P889): Piława Górna (Q2578092)) |
||
Property / beneficiary | Property / beneficiary | ||
Revision as of 12:00, 26 November 2020
Project Q96089 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “Regeneration of degraded areas of the Dzieżoni District – restoration of multi-family residential buildings” |
Project Q96089 in Poland |
Statements
271,126.45 zloty
0 references
371,406.1 zloty
0 references
73.0 percent
0 references
22 December 2016
0 references
28 September 2018
0 references
GMINA PIŁAWA GÓRNA
0 references
Projekt jest przedsięwzięciem służącym poprawie stanu budynków mieszkalnych na obszarze objętym rewitalizacją, zlokalizowanych przy ul. Sienkiewicza 17 i Sienkiewicza 20 w Piławie Górnej. Projekt wynika z Gminnego Programu Rewitalizacji dla Gminy Piława Górna na lata 2015-2020. Zakres prac przewidzianych w projekcie obejmuje odnowę tych części wspólnych wielorodzinnych budynków mieszkalnych, które zgodnie z przeprowadzonym przeglądem, posiadają zły stan techniczny. Prace objęte projektem polegają na: wymianie pokrycia dachowego, przemurowaniu kominów, wymianie tynków zewnętrznych, wymianie stolarki drzwiowej i okiennej, wykonaniu izolacji pionowych ścian fundamentowych, wykonaniu obróbek blacharskich z rynnami i rurami spustowymi. Efektem prac w ramach projektu będzie wsparcie 2 budynków mieszkalnych obejmujących 9 jednostek mieszkalnych, co przełoży się na poziom ponad 9% stopnia osiągnięcia pośredniej wartości (oraz 2,08% wartości docelowej) wskaźnika „Liczba wspartych obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach określonego” dla 2018 roku zgodnie z RPO WD 2014-2020. Projekt przyczyni się ponadto do osiągnięcia prawie 3% zakładanej wartości wskaźnika „Wyremontowane budynki mieszkalne na obszarach miejskich”. Wyboru optymalnego wariantu realizacji dokonano w oparciu o analizę opcji, analizę wielokryterialną oraz poprzez analizę opcji technicznych (metoda DGC). Wnioskodawcą będzie Gmina Piława Górna.. Wnioskodawca wraz z operatorem rewitalizowanej infrastruktury posiada, w celu zapewnienia prawidłowej realizacji projektu, konieczne i niezbędne zasoby ludzkie, organizacyjne techniczne oraz finansowe. Środki na realizację projektu zabezpieczone zostały (zgodnie z harmonogramem) w budżecie Wnioskodawcy na rok 2016 oraz 2017. W celu realizacji projektu zostanie utworzona grupa robocza, w skład której wejdą przedstawiciele merytoryczni Urzędu Gminy oraz Zarządu Budynków Mieszkalnych Sp. z o. o. w Piławie Górnej. (Polish)
0 references
The project is a project aimed at improving the condition of residential buildings in the revitalisation area, located at ul. Sienkiewicza 17 and Sienkiewicza 20 in Piława Górna. The project results from the Municipal Regeneration Programme for the Municipality of Piława Górna for the years 2015-2020. The scope of the work envisaged in the project includes the renewal of those parts of common multi-family residential buildings which, according to the review carried out, are in poor technical condition. The work covered by the project consists of: replacement of roof covering, walling of chimneys, replacement of external plaster, replacement of door and window joinery, construction of vertical foundation walls insulation, metalworking with gutters and drain pipes. The project will result in the support of 2 residential buildings covering 9 residential units, which will translate to more than 9 % of the achievement of the intermediate value (and 2.08 % of the target value) of the “Number of infrastructure supported facilities located in revitalised areas defined” for 2018 according to RAP WD 2014-2020. In addition, the project will contribute to nearly 3 % of the projected value of “renovated residential buildings in urban areas”. The optimal implementation option was chosen on the basis of options analysis, multi-criteria analysis and technical options analysis (the DGC method). The applicant will be the Municipality of Piława Górna.. The applicant and the operator of the revitalised infrastructure shall have, in order to ensure the proper implementation of the project, the necessary and necessary human, organisational and financial resources. The appropriations for the implementation of the project were secured (according to the timetable) in the Applicant’s budget for 2016 and 2017. In order to implement the project, a working group will be set up, consisting of representatives of the Municipal Office and the Management Board of Housing Buildings Sp. z o. o. in Piława Górna. (English)
15 October 2020
0 references
Identifiers
RPDS.06.03.01-02-0003/16
0 references