Construction of a interchange hub in the area of the railway station in Wisła Centrum – stage II: Revitalisation of the railway station building with adjacent surroundings (Q126156): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / beneficiaryProperty / beneficiary

Revision as of 12:39, 25 November 2020

Project Q126156 in Poland
Language Label Description Also known as
English
Construction of a interchange hub in the area of the railway station in Wisła Centrum – stage II: Revitalisation of the railway station building with adjacent surroundings
Project Q126156 in Poland

    Statements

    0 references
    1,776,629.88 zloty
    0 references
    426,391.17 Euro
    13 January 2020
    0 references
    2,090,152.8 zloty
    0 references
    501,636.67 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 June 2016
    0 references
    31 December 2018
    0 references
    GMINA WISŁA
    0 references
    0 references
    Przedmiotem projektu jest rewitalizacja zabytkowego budynku dworca kolejowego. Remont obejmie lewą stronę parteru budynku, kotłownię, windę oraz prawą stronę I piętra. Po przebudowie pierwotna bryła budynku zostanie zachowana. Parter będzie przedmiotem dzierżawy i zostanie odrestaurowany do stanu surowego. Dalsze prace wraz z wyposażeniem wykona przyszły dzierżawca. Na pierwszym piętrze powstanie przestrzeń dla seniorów i innych grup zagrożonych wykluczeniem społecznym. Organizacje pozarządowe, z którymi Gmina Wisła podejmie współpracę, organizować będą warsztaty i szkolenia umożliwiające integrację, podnoszenie kwalifikacji oraz udział w życiu kulturalnym i społecznym miasta dla w/w grup społecznych. Zaprojektowano wymianę stropów, więźby dachowej, stolarki okiennej i drzwiowej, instalacji elektrycznych i sanitarnych, schodów wewnętrznych i zewnętrznych oraz wzmocnienie i naprawę ścian konstrukcyjnych zewnętrznych i wewnętrznych. (Polish)
    0 references
    The subject of the project is the revitalisation of the historic railway station building. The renovation will cover the left side of the building, boiler room, elevator and right side of the first floor. After the reconstruction, the original body of the building will be preserved. The ground floor will be leased and will be restored to a strict state. Further work and equipment will be carried out by the future tenant. On the first floor there will be a space for seniors and other groups at risk of social exclusion. Non-governmental organisations, with which the Municipality of Wisła will cooperate, will organise workshops and trainings enabling integration, upgrading of qualifications and participation in the cultural and social life of the city for the above-mentioned social groups. Replacement of ceilings, roofing, window and door carpentry, electrical and sanitary installations, internal and external staircases and reinforcement and repair of external and internal walls were designed. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.10.03.05-24-07E5/17
    0 references