216_TRINITU & VIGNOL_411_ENERGY AND SCHOOL ENERGY MANAGEMENT (Q2155070): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
description / endescription / en
Project in Italy financed by DG Regio
Project Q2155070 in Italy
description / itdescription / it
Progetto in Italia finanziato da DG Regio
Progetto Q2155070 in Italia

Revision as of 04:00, 3 November 2020

Project Q2155070 in Italy
Language Label Description Also known as
English
216_TRINITU & VIGNOL_411_ENERGY AND SCHOOL ENERGY MANAGEMENT
Project Q2155070 in Italy

    Statements

    0 references
    111,282.34 Euro
    0 references
    222,564.69 Euro
    0 references
    50.0 percent
    0 references
    1 October 2017
    0 references
    30 November 2020
    0 references
    COMUNE DI TRINITA' D'AGULTU E VIGNOLA
    0 references
    0 references

    40°59'1.57"N, 8°54'56.23"E
    0 references
    L¿INTERVENTO PREVEDE L¿EFFICIENTAMENTO ENERGETICO AGENDO PRINCIPALMENTE SUL SISTEMA DI GENERAZIONE (PREVISTO A CONDENSAZIONE), DI EMISSIONE E SOPRATTUTTO DI REGOLAZIONE, INSTALLANDO UN SISTEMA AVANZATO DI CONTROLLO E GESTIONE. PER LIMITARE I COSTI, SI Ê DECISO DI NON STRAVOLGERE IL SISTEMA DI EMISSIONE E IL TIPO DI CARBURANTE. PER QUANTO RIGUARDA L¿ISOLAMENTO, VISTO IL DISCRETO SPESSORE DELLE MURATURE E IL BUONO STATO DEGLI INFISSI, SI Ê OPTATO PER LA COIBENTAZIONE DEI SOLAI DI COPERTURA PER ENTRAMBI GLI EDIFICI, ANCHE PER MINIMIZZARE LE SPESE E MASSIMIZZARE IL RISPARMIO, CON MATERIALI ECOSOSTENIBILI . (Italian)
    0 references
    THIS INTERVENTION IS INTENDED TO IMPROVE ENERGY EFFICIENCY BY FOCUSING ON THE SYSTEM OF GENERATION (INTENDED FOR CONDENSATION), EMISSION AND, ABOVE ALL, REGULATING, INSTALLING AN ADVANCED CONTROL AND MANAGEMENT SYSTEM. IN ORDER TO LIMIT COSTS, THE DECISION WAS TAKEN NOT TO DISTORT THE EMISSION SYSTEM AND THE TYPE OF FUEL. AS REGARDS REMOTENESS, GIVEN THE THICKNESS OF THE WALLS AND THE GOOD STATE OF THE FIXTURES, THE OPTION OF INSULATION OF THE ROOF FLOORS FOR BOTH BUILDINGS WAS TAKEN, INCLUDING WITH A VIEW TO MINIMISING EXPENDITURE AND MAXIMISING SAVINGS, WITH ENVIRONMENTALLY SUSTAINABLE MATERIALS. (English)
    0 references

    Identifiers