MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND WATERWAY SYSTEM OF THE EASTERN PART OF THE EASTERN AREA OF NAPLES, SITUATED AT THE DISPOSAL OF THE EAST AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA (Q2150680): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 03:06, 3 November 2020
Project Q2150680 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND WATERWAY SYSTEM OF THE EASTERN PART OF THE EASTERN AREA OF NAPLES, SITUATED AT THE DISPOSAL OF THE EAST AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA |
Project Q2150680 in Italy |
Statements
25,218,993.5 Euro
0 references
33,625,324.66 Euro
0 references
75.0 percent
0 references
20 December 2001
0 references
9 February 2019
0 references
AUTORITA' DI SISTEMA PORTUALE DEL MAR TIRRENO CENTRALE
0 references
LA REALIZZAZIONE DEI LAVORI DI ESCAVO PERMETTE IL MIGLIORAMENTO DELLE CONDIZIONI DI SICUREZZA PER LE NAVI CHE ATTUALMENTE FANNO SCALO NEL PORTO DI NAPOLI, CONSENTENDO UN NOTEVOLE MIGLIORAMENTO DELLA MANOVRE E DELL'ORMEGGIO DELLE STESSE. SI TRATTA DI DRAGAGGIO DI MATERIALE DEPOSITATO NEI DECENNI CHE SARà DEPOSITATO NELLA CASSA DI COLMATA REALIZZATA ALLA DARSENA DI LEVANTE DEL PORTO DI NAPOLI.NELL'AMBITO DEI LAVORI DI DRAGAGGIO Ê PREVISTA LA DEMOLIZIONE DEL PONTILE ESISTENTE ALLA DARSENA MARINELLA UTILIZZATO PER IL CARICO DELLE RINFUSE ASSERVITE AL SILOS GRANARIO, ATTUALMENTE INUTILIZZATO E FATISCENTE. (Italian)
0 references
THE IMPLEMENTATION OF THE CABLE WORKS ALLOWS FOR THE IMPROVEMENT OF THE SAFETY CONDITIONS FOR SHIPS CURRENTLY CALLING AT THE PORT OF NAPLES, ALLOWING FOR A SIGNIFICANT IMPROVEMENT OF MANOEUVRE AND OF THE MOORING OF SHIPS. THIS CONCERNS THE DREDGING OF MATERIALS FOR THE DECADES DEPOSITED IN THE CLOSED STORAGE TANKS OF THE LEVANT HARBOUR IN THE HARBOUR OF THE HARBOUR OF THE PORT OF NAPOL. IN THE CONTEXT OF THE DREDGING, IT IS PLANNED TO DEMOLISH THE EXISTING JETTY AT THE DARSENA MARINELLA, WHICH IS USED FOR THE LOADING OF THE BULK OF THE BULK OF THE SUGAR SILOS, WHICH IS CURRENTLY UNUSED AND DILAPIDATED. (English)
0 references
Identifiers
I67E12000290007
0 references