(A19_093_2016_0930023_1023) COPOENN (Q2066464): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:11, 2 November 2020
Project Q2066464 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_093_2016_0930023_1023) COPOENN |
Project Q2066464 in Italy |
Statements
29,049.25 Euro
0 references
58,098.5 Euro
0 references
50.0 percent
0 references
1 August 2016
0 references
13 December 2018
0 references
15 December 2018
0 references
COOPERATIVA ITALIA NUOVA GREVE IN CHIANTI SOCIETA' COOPERATIVA
0 references
2A) SOSTITUZIONE DI SERRAMENTI E INFISSI: ATTUALMENTE GLI INFISSI SONO IN ALLUMINIO ANODIZZATO NERO E SOLO VETRI DI SICUREZZA. TRASMITTANZA INFISSI ATTUALI 6 W/MQK; TRASMITTANZA INFISSI DI PROGETTO 1,7 W/MQK. GLI INFISSI CHE SI SOSTITUISCONO SARANNO IN LEGA DI ALLUMINIO EN AW 6060 (EN 573-3 E EN 755-2) CON TELAI FISSI E LE ANTE APRIBILI REALIZZATI CON PROFILATI AD INTERRUZIONE DI PONTE TERMICO A TRE CAMERE (PROFILO INTERNO ED ESTERNO TUBOLARI, COLLEGATI TRA DI LORO CON BARRETTE IN POLIAMMIDE). PRESTAZIONI SERRAMENTI DI PERMEABILITA ALL'ARIA, TENUTA ALL'ACQUA E RESISTENZA AL VENTO SECONDO NORME EN12207-12208-12210 E EN1026-1027-1221. UGUALMENTE SARANNO REALIZZATE LE ANTE SCORREVOLI PER LA CLIENTELA. 3A) SOSTITUZIONE DI IMPIANTI DI CLIMATIZZAZIONE CON IMPIANTI ALIMENTATI DA POMPE DI CALORE AD ALTA EFFICIENZA: L'IMPIANTO ATTUALMENTE ESISTENTE E COMPOSTO DA UNA CALDAIA 115 KW RIELLO CONDEXA PRO3 ALLINSIDE, DESTINATA ALLA CLIMATIZZAZIONE INVERNALE; REFRIGERATORE ARIA-ACQUA UNIFLAIR ACQUAFLA (Italian)
0 references
2A) REPLACEMENT OF WINDOW AND WINDOW FRAMES: AT PRESENT, THE FIXTURES ARE MADE OF BLACK ANODITISED ALUMINIUM AND ONLY SAFETY GLASS. CURRENT TRANSMITTANCE OF CURRENT FIXTURES 6 W/MQK; TRANSMITTANCE OF PROJECT FIXTURES 1,7 W/MQK. THE REPLACING WINDOWS WILL BE MADE OF ALUMINIUM ALLOY EN W 6060 (EN 573-3 AND EN 755-2) WITH FRAMES FIXED AND THE OPENING DOORS MADE FROM THERMAL BRIDGES TO THREE CHAMBERS (INTERNAL AND EXTERNAL TUBES, CONNECTED WITH POLYAMIDE BARS). SUPPLY AND FIRE RESISTANCE PERFORMANCES ACCORDING TO STANDARDS EN12207-12208-12210 AND EN1026-1027-1221. EVEN THE SLIDING DOORS FOR CUSTOMERS WILL BE CARRIED OUT. 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH PLANTS POWERED BY HIGH-EFFICIENCY HEAT PUMPS: THE EXISTING PLANT, WHICH IS COMPOSED OF A 115 KW BOILER CONDESXA PRO3 ALLINSIDE, FOR WINTER HEATING; UNIFLAIR ACQUALA WATER CHILLER (English)
0 references
Identifiers
D58I16002170009
0 references