(15988.27102017.119000058) LINS_AMB (Q2059102): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 12:47, 2 November 2020

Project Q2059102 in Italy
Language Label Description Also known as
English
(15988.27102017.119000058) LINS_AMB
Project Q2059102 in Italy

    Statements

    0 references
    74,110.76 Euro
    0 references
    148,221.51 Euro
    0 references
    50.0 percent
    0 references
    28 February 2018
    0 references
    29 February 2020
    0 references
    29 February 2020
    0 references
    LINSIEME - FILATI - S.R.L.
    0 references
    0 references
    0 references

    43°52'50.16"N, 11°5'48.95"E
    0 references
    SONO PREVISTI 2 INTERVENTI: 1A) SOSTITUZIONE DELLA COPERTURA DELL?INTERO FABBRICATO CON ALTRA AVENTE VALORI DI TRASMITTANZA MIGLIORI, COMPOSTA DA STRUTTURA PORTANTE METALLICA CON ALL?INTRADOSSO TERMOPANNELLI DI LAMIERA E POLIURETANO CON SOVRASTANTE STRATO DI LANA DI VETRO E. ALL?ESTRADOSSO, LASTRA GRECATA IN ALLUMINIO NATURALE CON ISOLANTE POLIURETANICO. 5B) REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DA CIRCA 122 KWP COLLEGATO ALLA RETE D?UTENZA AZIENDALE PER AUTOCONSUMO. L?ENERGIA PRODOTTA DALL?IMPIANTO SARA PARI A CIRCA 142.000 KWH/ANNO, INFERIORE A QUELLA COMPLESSIVA NECESSARIA AL FABBRICATO ED ALLE LAVORAZIONI SVOLTE AL SUO INTERNO.L'INTERVENTO 5A) PRECEDENTEMENTE INDICATO NON VIENE PIU' RICHIESTO (Italian)
    0 references
    THERE WILL BE 2 INTERVENTIONS: 1A) REPLACING THE COVER OF THE WHOLE BUILDING WITH ANOTHER OF BETTER TRANSMITTANCE VALUES, MADE UP OF A METAL-BEARING CARRIER STRUCTURE WITH ALL LAYERS OF METAL WOOL WITH ALL OF THE ABOVE LAYERS OF E GLASS WOOL, TO THE POINT OF DEPARTURE, PLATE OF NATURAL ALUMINIUM WITH POLYURETHANE INSULATOR. 5 (B) INSTALLATION OF PHOTOVOLTAIC FACILITIES OF ABOUT 122 KWP CONNECTED TO THE NETWORK D? BUSINESS USERS FOR OWN CONSUMPTION. THE ENERGY PRODUCED BY THE PLANT WILL BE APPROXIMATELY 142.000 KWH/YEAR, LESS THAN THE TOTAL AMOUNT NEEDED FOR THE BUILDING AND PROCESSING CARRIED OUT FOR ITS INTERNO.MEASURE 5A) MENTIONED ABOVE IS NO LONGER REQUIRED. (English)
    0 references

    Identifiers