(10360.14072017.115000104) PRIMARY SCHOOL OF VIA MAZZINI (Q2057015): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 12:08, 2 November 2020
Project Q2057015 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000104) PRIMARY SCHOOL OF VIA MAZZINI |
Project Q2057015 in Italy |
Statements
137,282.81 Euro
0 references
356,578.72 Euro
0 references
38.5 percent
0 references
31 July 2017
0 references
29 March 2020
0 references
30 April 2020
0 references
COMUNE DI TORRITA DI SIENA
0 references
IL PROGETTO RIGUARDA UN UNICO EDIFICIO E PREVEDE LA REALIZZAZIONE DI N?2 LOTTI FUNZIONALI. IL 1? LOTTO RIGUARDA LA RISTRUTTURAZIONE DELLA CENTRALE TERMICA. GLI INTERVENTI DA ESEGUIRE RIGUARDANO PRINCIPALMENTE LA SOSTITUZIONE DELL?ATTUALE CALDAIA A BASAMENTO A GAS CON UN GENERATORE TERMICO A CONDENSAZIONE, L?INSTALLAZIONE ESTERNA DI UNA POMPA DI CALORE ARIA/ACQUA IN INTEGRAZIONE E DI UN CAMPO FOTOVOLTAICO SULLA COPERTURA DELLA PALESTRA. L?IMPIANTO SAR? DOTATO DI UN DEMINERALIZZATORE SUL REINTEGRO ALLA CALDAIA E DI UN DOSATORE DI POLIFOSFATI SUL REINTEGRO DEL CIRCUITO SECONDARIO PER GARANTIRE UNA DURATA MAGGIORE DELLE COMPONENTISTICHE IDRAULICHE. SAR? INOLTRE INSTALLATO UNO SCAMBIATORE DI CALORE A PIASTRE PER DIVIDERE IL CIRCUITO PRIMARIO DI PRODUZIONE CALORE CON IL SECONDARIO ESISTENTE. L?IMPIANTO INTERNO DEL GAS VERR? MODIFICATO PER ESSERE ADATTATO AL COLLEGAMENTO COL NUOVO GENERATORE DI CALORE. LA MODIFICA RIGUARDER? ANCHE IL CONDOTTO DEI FUMI. CHE SAR? MODELLATO PER RIALLACCIARE LA C (Italian)
0 references
THE PROJECT COVERS A SINGLE BUILDING AND PROVIDES FOR THE IMPLEMENTATION OF N? 2 FUNCTIONAL BATCHES. 1? LOT CONCERNS THE RENOVATION OF THE THERMAL POWER PLANT. THE INTERVENTIONS TO BE CARRIED OUT MAINLY CONCERN THE REPLACEMENT OF THE CURRENT GAS CRANKCASE BOILER WITH A CONDENSING THERMAL GENERATOR, THE EXTERNAL INSTALLATION OF AN INTEGRATED AIR-TO-WATER HEAT PUMP AND A PHOTOVOLTAIC FIELD ON THE GYM COVER. L? SAR? EQUIPPED WITH A RELAXATION ON THE MAKE-UP OF THE BOILER AND A SECONDARY SCHOOL DOSING DEVICE ON THE REINTEGRATION OF THE SECONDARY CIRCUIT TO ENSURE A LONGER DURATION OF HYDRAULIC COMPONENTS. SAR? IN ADDITION, A PLATE HEAT EXCHANGER INSTALLED TO DIVIDE THE PRIMARY HEAT PRODUCTION CIRCUIT WITH THE EXISTING SECONDARY CIRCUIT. L? IS THE INTERNAL INSTALLATION OF THE GAS VERR? MODIFIED TO BE ADAPTED TO THE LINK WITH THE NEW HEAT GENERATOR. HAS THE AMENDMENT BEEN AMENDED? ALSO THE FLUE DUCT. WHAT IS THE RESULT OF THE SAR? SHAPED TO REACHL C (English)
0 references
Identifiers
B94D17000220007
0 references