(10360.14072017.115000025) ENERGY REFURBISHMENT OF PODENZANA SCHOOLS (Q2056949): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 12:07, 2 November 2020

Project Q2056949 in Italy
Language Label Description Also known as
English
(10360.14072017.115000025) ENERGY REFURBISHMENT OF PODENZANA SCHOOLS
Project Q2056949 in Italy

    Statements

    0 references
    56,794.72 Euro
    0 references
    141,986.8 Euro
    0 references
    40.0 percent
    0 references
    15 March 2018
    0 references
    15 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI PODENZANA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO 1: ISOLAMENTO TERMICO DELLA COPERTURA SIA PIANA CHE A FALDE INCLINATAINTERVENTO 2: SOSTITUZIONE DEGLI INFISSI DEL PIANO PRIMOINTERVENTO 3: SOSTITUZIONE CALDAIA ESISTENTE CON CALDAIA A CONDENSAZIONE E INSERIMENTO VALVOLE TERMOSTATICHE SUI DISPOSITIVI TERMINALIINTERVENTO 4: REALIZZAZIONE DI IMPIANTO SOLARE TERMICO PER LA PRODUZIONE DI ACQUA CALDA SANITARIA INTEGRATO ALL'IMPIANTO DI CLIMATIZZAZIONE INVERNALE INTERVENTO 5: REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO PER LA PRODUZIONE DI ENERGIA ELETTRICA IN REGIME DI AUTOCONSUMOINTERVENTO 6: REALIZZAZIONE DI IMPIANTO DI DOMOTICA COMPRENSIVO DI RILEVATORI DI PRESENZA INFRAROSSI (Italian)
    0 references
    ACTION 1: THERMAL INSULATION OF COVER FOR BOTH FLAT AND INCLINATORIES 2: REPLACEMENT OF THE INPRIMINFORVENTION WINDOW FRAMES 3: REPLACEMENT OF EXISTING BOILER WITH CONDENSING BOILER AND INSERTION OF TEST VALVES ON THE TERMS OF THE 4: ESTABLISHMENT OF A SOLAR THERMAL SYSTEM FOR THE PRODUCTION OF HOT WATER INTEGRATED INTO THE WINTER AIR CONDITIONING SYSTEM INTERVENTION 5: PRODUCTION OF PHOTOVOLTAIC INSTALLATIONS FOR THE PRODUCTION OF ELECTRICITY UNDER THE AUTHORITY OF AUTOLAW 6: CONSTRUCTION OF HOME AUTOMATION SYSTEMS INCLUDING INFRARED FIRE DETECTORS (English)
    0 references

    Identifiers