(10360.14072017.115000236) E. MUNICIPAL SWIMMING POOL (Q2057110): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 11:34, 2 November 2020
Project Q2057110 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000236) E. MUNICIPAL SWIMMING POOL |
Project Q2057110 in Italy |
Statements
162,834.56 Euro
0 references
437,492.1 Euro
0 references
37.22 percent
0 references
3 April 2018
0 references
3 April 2020
0 references
16 November 2020
0 references
COMUNE DI BIBBIENA
0 references
INTERVENTO 1: ISOLAMENTO TERMICO DI STRUTTURE VERTICALI IN SEGUITO ALL?ALLESTIMENTO DEL PONTEGGIO SI PROCEDE ALLA RIMOZIONE DEL RIVESTIMENTO ESISTENTE E ALLA PULIZIA DELLA PARETE IN CALCESTRUZZO SOTTOSTANTE. SUCCESSIVAMENTE SI PROCEDE ALLA APPLICAZIONE DI PANNELLO COIBENTE DI POLISTIRENE ESTRUSO DELLO SPESSORE DI 10 CM (? = 0,028 W/MQ*K) IN ADERENZA ALLA PARETE MEDIANTE INCOLLAGGIO. L?OPERA VIENE COMPLETATA CON L?APPLICAZIONE DI RIVESTIMENTO COSTITUITO DA LASTRA CON STRUTTURA A SANDWICH IN CONGLOMERATO CEMENTIZIO ALLEGGERITO DELLO SPESSORE DI 12 MM, ARMATA SU ENTRAMBI I LATI DA UNA RETE IN FIBRA DI VETRO ALTAMENTE RESISTENTE AGLI ALCALI.INTERVENTO 2: SOSTITUZIONE DI SERRAMENTI ED INFISSI IL SISTEMA FINESTRA VETRO DOVR? ESSERE RISPONDENTE ALLA TRASMITTANZA PRESCRITTA PER LEGGE FISSATA NEL VALORE DI U 1,3 W/MQK. NELL?INTERVENTO SI DEVE COMPRENDERE LA FORNITURA E POSA DI CONTROTELAI IN ACCIAIO ZINCATO MESSI IN OPERA CON ANCORANTE CHIMICO E PERNI IN ACCIAIO OVE NON PRESENTI O NON IDONEI QU (Italian)
0 references
ACTION 1: THERMAL INSULATION OF VERTICAL STRUCTURES FOLLOWING THE SCAFFOLDING IS SET UP, THE EXISTING COATING IS REMOVED AND THE CONCRETE WALL IS CLEANED. SUBSEQUENTLY, HAVE EXTRUDED POLYSTYRENE IN THE THICKNESS OF 10 CM (? = 0,028 W/M²) IN ADHESION TO THE WALL BY BONDING. L? WORKS IS COMPLETED WITH THE COATING COATING MADE OF SANDWICH PANELS WITH A LIGHT CONGLOMERATE SANDWICH STRUCTURE WITH A THICKNESS OF 12 MM, ON BOTH SIDES WITH A HIGHLY RESISTANT GLASS FIBRE NETWORK IN ALCALI.INTERVENTO 2: WINDOW FRAMES AND WINDOWS IN THE GLASS WINDOW? BE COMPLIANT WITH THE STATUTORY TRANSMITTANCE SET IN U 1,3 W/MQK. IN? INTERVENTION, IT IS NECESSARY TO INCLUDE THE SUPPLY AND INSTALLATION OF GALVANISED STEEL ROPES AND FRAMES MADE BY CHEMICALS AND STUDS MADE OF STEEL WHEN NOT PRESENT OR UNFIT. (English)
0 references
Identifiers
J38J18000070002
0 references