CN NUMERICALLY CONTROLLED PUNCHING (Q2040911): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 09:03, 2 November 2020
Project Q2040911 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | CN NUMERICALLY CONTROLLED PUNCHING |
Project Q2040911 in Italy |
Statements
31,500.0 Euro
0 references
63,000.0 Euro
0 references
50.0 percent
0 references
26 November 2018
0 references
30 April 2019
0 references
ERREPAN S.R.L.
0 references
Q284276 (Deleted Item)
0 references
IL PROGETTO PREVEDE L'ACQUISTO DI: 1) PUNZONATRICE ELETTRICA A CNC MOD. AE 2610 NT COMPLETA DI SISTEMI DI SICUREZZA, KIT DI STAMPI, SOFTWARE DEDICATO; 2) SISTEMA DI CARICO E SCARICO AUTOMATICO COMPLETO DI SISTEMI DI SICUREZZA, PLC, TERMINALE OPERATIVO; 3) PACCHETTO SOLUTION PACK PER L¿INTERCONNESSIONE AI SISTEMI INFORMATICI DI FABBRICA CON CARICAMENTO DA REMOTO DI ISTRUZIONI. L'INVESTIMENTO COMPORTER¿NA NOTEVOLE EVOLUZIONE IN TERMINI DI TECNOLOGIA APPLICATA AI PRODOTTI ATTRAVERSO: A) UN AUMENTO DELLA PRODUZIONE DI TEGLIE CON UN MONITORAGGIO MAGGIORE E COSTANTE DOVUTO ALLA PI¿ RECENTE TECNOLOGIA UTILIZZATA; B) UNA LAVORAZIONE SPECIFICA DI LAMIERE CHE PERMETTER¿NCHE LA REALIZZAZIONE DI PRODOTTI DI QUALIT¿UPERIORE; C) UNA REALIZZAZIONE DI NUOVI MANUFATTI DI MAGGIORI DIMENSIONI; D) UNA PI¿ EFFICACE GESTIONE DEI DATI DI PRODUZIONE ATTRAVERSO UNA INTEGRAZIONE HARDWARE E SOFTWARE FRA IMPIANTO ED UFFICIO TECNICO E UFFICIO PRODUZIONE. IL PROGETTO CHE L¿AZIENDA INTENDE SVILUPPARE PERTANTO (Italian)
0 references
THE PROJECT INVOLVES THE PURCHASE OF: 1) CNC PUNCHING MACHINE FOR CNC MOD. AE 2610 FULL NT OF SECURITY SYSTEMS, PRESS KIT, DEDICATED SOFTWARE; (2) COMPLETE AUTOMATIC LOADING AND UNLOADING SYSTEM FOR SAFETY SYSTEMS, PLC, OPERATING TERMINAL; (3) SOLUTION PACK IN CASE OF INTERCONNECTION TO FACTORY COMPUTER SYSTEMS WITH REMOTE LOADING OF INSTRUCTIONS. THE COMPLEX EVOLUTION OF TECHNOLOGY APPLIED TO THE PRODUCTS THROUGH: (A) AN INCREASE IN THELIE OUTPUT WITH MORE AND SUSTAINED MONITORING DUE TO THE RECENT TECHNOLOGY USED; (B) A SPECIFIC PROCESSING OF SHEETS WHICH SHOULD NOT BE USED FOR THE PRODUCTION OF QUALITY PRODUCTS; (C) THE CREATION OF NEW, LARGER MANUFACTURED PRODUCTS; AN EFFECTIVE MANAGEMENT OF PRODUCTION DATA THROUGH THE INTEGRATION OF HARDWARE AND SOFTWARE BETWEEN THE PLANT AND THE TECHNICAL OFFICE AND THE PRODUCTION OFFICE. THE PROJECT THAT HE HAS BEEN PLANNING TO DEVELOP ACCORDINGLY (English)
0 references
Identifiers
E77I19000210006
0 references