FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC (Q2036675): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 08:53, 2 November 2020

Project Q2036675 in Italy
Language Label Description Also known as
English
FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC
Project Q2036675 in Italy

    Statements

    0 references
    122,072.02 Euro
    0 references
    244,144.04 Euro
    0 references
    50.0 percent
    0 references
    14 October 2016
    0 references
    31 December 2019
    0 references
    COMUNE DI ARICCIA
    0 references
    0 references
    0 references

    41°43'14.56"N, 12°40'16.86"E
    0 references
    INTERVENTI DI SISTEMAZIONE CON OPERE DI INGEGNERIA NATURALISTICA E REGIMENTAZIONE IDRAULICA DELLE ACQUE PROVENIENTI DA VIA DELLE CERQUETTE E VIA DELL'UCCELLIERA A TUTELA DELL'INCOLUMITà PUBBLICA (Italian)
    0 references
    FITTING OUT OF NATURAL ENGINEERING AND HYDRAULIC SYSTEM OF THE WATERS COMING FROM CERQUES AND THE ROUTE TAKEN INTO ACCOUNT FOR THE CARRIAGE OF WATER FOR THE PROTECTION OF THE PUBLIC (English)
    0 references

    Identifiers

    D76J17000090006
    0 references