SMART GRID OF PRIMARY CAB OF THE PONTELANDOLFO (Q2017738): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
description / endescription / en
Project in Italy financed by DG Regio
Project Q2017738 in Italy
description / itdescription / it
Progetto in Italia finanziato da DG Regio
Progetto Q2017738 in Italia

Revision as of 03:29, 2 November 2020

Project Q2017738 in Italy
Language Label Description Also known as
English
SMART GRID OF PRIMARY CAB OF THE PONTELANDOLFO
Project Q2017738 in Italy

    Statements

    0 references
    3,100,707.36 Euro
    0 references
    4,197,180.97 Euro
    0 references
    73.88 percent
    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    41°17'13.60"N, 14°41'32.24"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO CONSISTE NELLA REALIZZAZIONE DI UNA NUOVA CABINA PRIMARIA, IN LINEA CON I PIù RECENTI STANDARD TECNOLOGICI, RENDENDO SMART SIA LA CABINA PRIMARIA CHE LE CABINE SECONDARIE E I CENTRI SATELLITE SOTTESI.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITà SMART:-SELETTIVITà LOGICA DEL TRONCO GUASTO-OSSERVABILITà DELLA RETE MT-CONTROLLO EVOLUTO DI TENSIONE A LIVELLO DI SBARRA DI CP-AUTOMAZIONE DEGLI INT (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE AIM OF THE STRUCTURAL MEASURES IS TO MODIFY THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND THE DESIGN OF THE INSTALLATION IS TO CARRY OUT A NEW PRIMARY CAB, IN ACCORDANCE WITH THE RECENT TECHNOLOGICAL STANDARDS, MAKING SMART BOTH THE PRIMARY AND THE SECONDARY AND THE SATELLITE CENTRES SOTTIS.THE PROJECT QUALIFIES AS SMART GRIDS FOR THE INSTALLATION OF SMART TECHNOLOGY AND SMART EQUIPMENT FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS RESPECT, THE FOLLOWING FUNCTIONS WILL BE IMPLEMENTED AS A TOOL FOR SMART: — ATTRIBUTE TO THE UASTO-ROBSERVABILITY TRUNK OF THE MT-DEFERRED CONTROL NETWORK AT THE CP-AUTOMOTION NETWORK OF THE INT. (English)
    0 references

    Identifiers

    F95J18000000006
    0 references