TO BE LINKED AT ALL TIMES (Q1874359): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
description / endescription / en
Project in Italy financed by DG Regio
Project Q1874359 in Italy
description / itdescription / it
Progetto in Italia finanziato da DG Regio
Progetto Q1874359 in Italia

Revision as of 04:09, 1 November 2020

Project Q1874359 in Italy
Language Label Description Also known as
English
TO BE LINKED AT ALL TIMES
Project Q1874359 in Italy

    Statements

    0 references
    7,500.0 Euro
    0 references
    7,500.0 Euro
    0 references
    100.0 percent
    0 references
    26 January 2016
    0 references
    14 December 2016
    0 references
    14 December 2016
    0 references
    " ATERNO - MANTHONE' "
    0 references

    42°28'10.60"N, 14°12'21.35"E
    0 references
    IL PROGETTO PREVEDE LA REALIZZAZIONE DI 1 CABLAGGIO IN CAT 6 COMPLETO DI RACK 19 POLLICI E 20 POSTAZIONI NEL LABORATORIO GEOMETRI DEL SECONDO PIANO DELLA PALAZZINA VICE PRESIDENZA 2 NUOVE DORSALI GIGABIT DAL CENTRO STELLA ESISTENTE VERSO I 6 LABORATORI DEL 2 PIANO VERSO IL LABORATORIO DEL 1 PIANO ED AL PIANO TERRA IN AULA MAGNA E LABORATORIO DI SOSTEGNO 3 NUOVE DORSALI NELLEDIFICIO PRESIDENZA DAL CENTRO STELLA DEL PIANO TERRA VERSO LAULA MAGNA ED IL RACK DEL SECONDO PIANO 4 DORSALE DAL RACK 2 PIANO ALLAULA 5 REALIZZAZIONE DEL CABLAGGIO STRUTTURATO APPARATI PASSIVI IL DIMENSIONAMENTO DEL PROGETTO E LE CARATTERISTICHE DELLA SOLUZIONE SARANNO TALI DA ASSICURARE UNA ELEVATA SCALABILIT E FLESSIBILIT CHE TENGA CONTO DELLEVOLUZIONE PRESUNTA SUL CARICO DI LAVORO DELLAMMINISTRAZIONE NELLA FASE DI PROGETTAZIONE SI TENUTO CONTO DELLE POSSIBILI OTTIMIZZAZIONI IN TERMINI DI EFFICIENZA E DI RISPARMIO ENERGETICO DELLA RETE LOCALE E DELLE INFRASTRUTTURE COLLEGATE O FORNITURA DI MATERIALI ED ATTREZZAG (Italian)
    0 references
    THE PROJECT INVOLVES THE CONSTRUCTION OF 1 CABLING IN CAT 6 COMPLETE RACK-19 INCHES AND 20 LOCATIONS IN THE SURVEYORS OF THE SECOND FLOOR OF THE PALAZZINA VICE-PRESIDENT FOR THE 2-FLOOR OF THE 6-FLOOR AND THE 2 GROUND FLOOR FOR NEW BACKBONE NETWORKS IN THE 1 FLOOR AND TO THE GROUND FLOOR IN THE FLOOR IN THE CENTRE OF THE GROUND FLOOR AND THE RACK OF THE SECOND FLOOR 3 BACKBONE PLAN FOR MAGNA AND THE RACK OF THE SECOND FLOOR 4 FLOOR 2 ALLAAWU, 5 THE DESIGN OF THE STRUCTURED SYSTEM CABLING AND THE CHARACTERISTICS OF THE SOLUTION WILL BE SUCH AS TO ENSURE A HIGH SCALE OF EFFICIENCY AND ENERGY SAVING OF THE LOCAL NETWORK AND OF THE INFRASTRUCTURE CONNECTED WITH, OR SUPPLY OF, MATERIALS AND INFRASTRUCTURE (English)
    0 references

    Identifiers