ALL FOR A NETWORK FOR ALL (Q1866857): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 02:31, 1 November 2020

Project Q1866857 in Italy
Language Label Description Also known as
English
ALL FOR A NETWORK FOR ALL
Project Q1866857 in Italy

    Statements

    0 references
    18,500.0 Euro
    0 references
    18,500.0 Euro
    0 references
    100.0 percent
    0 references
    1 February 2016
    0 references
    2 March 2017
    0 references
    2 March 2017
    0 references
    POLO TECNICO PROFESSIONALE DI LUGO
    0 references

    44°25'7.97"N, 11°54'29.63"E
    0 references
    IL PRESENTE PROGETTO BASATO SUI RISULTATI DELLINDAGINE CONDOTTA CON METODO SWOT IN OCCASIONE DELLA COMPILAZIONE DEL RAV MIRA A REALIZZARE UNA PROFONDA INNOVAZIONE METODOLOGICA BASATA SULLE NUOVE TECNOLOGIE PER LA QUALE INDISPENSABILE LA TOTALE COPERTURA LANWLAN DEI VARI PLESSI COSTITUENTI LISTITUTO LA RIVOLUZIONE COMUNICATIVA GENERATA DALLA DIFFUSIONE DI INTERNET E DELLA TECNOLOGIA MOBILE TABLET SMARTPHONE LETTORI MP3 ECC IMPONE ALLA SCUOLA LAPERTURA DI NUOVI CANALI COMUNICATIVI E COOPERATIVI IN GRADO DI RISPONDERE ALLE ABITUDINI DELLE GENERAZIONI DIGITALILA FINALIT DEL PROGETTO DI TRASMETTERE AGLI ALUNNI LE METODICHE DI RICERCA DI APPRENDIMENTO E DI COMUNICAZIONE IN GRADO DI GARANTIRE UNA RISPOSTA AI FUTURI BISOGNI PROFESSIONALI E NON ATTRAVERSO UN UTILIZZO CONSAPEVOLE E FINALIZZATO DELLE ICTIL NOSTRO ISTITUTO COSTITUITO DA 3 PLESSI ED HA CIRCA 1300 ALUNNI LA SITUAZIONE DI CONNETTIVIT AL MOMENTO SIMILE NEI TRE PLESSI E CIO PRESENTE UNA RETE LAN CHE COLLEGA ALCUNI SPAZI SPECIFIC (Italian)
    0 references
    THE PRESENT PROJECT BASED ON THE RESULTS OF THE SWOT METHOD USED IN THE PREPARATION OF THE RAV AIMS TO ACHIEVE A PROFOUND METHODOLOGICAL INNOVATION BASED ON THE NEW TECHNOLOGIES FOR WHICH THE TOTAL LANWLAN COVERAGE OF THE VARIOUS CONSTITUENT PLANDS OF THE INSTITUTE THE COMMUNICATION REVOLUTION GENERATED BY THE DEPLOYMENT OF THE INTERNET AND THE MOBILE TECHNOLOGY TABLET DEVICE MP3, ETC., REQUIRES THE SCHOOL TO OPEN NEW COMMUNICATIVE AND COOPERATIVE WAYS OF RESPONDING TO THE HABITS OF THE DIGITALYIALIT OF THE PROJECT TO PROVIDE PUPILS WITH THE LEARNING AND COMMUNICATION SEARCH METHODS ABLE TO RESPOND TO FUTURE PROFESSIONAL NEEDS AND NOT THROUGH A CONSCIOUS AND FINALISED USE OF THE ICTIL INSTITUTE SET UP AS OF 3, AND HAS APPROXIMATELY 1300 PUPILS THE SITUATION OF CONNECTIVIT AT THE SAME TIME IN THE THREE TABLES, AND THAT A LAN LINKING CERTAIN SPECIFIC SPACES IN THIS CASE IS SIMILAR. (English)
    0 references

    Identifiers