Revitalisation of the old bathhouse and boulevards on the Black Hańcza river in Suwałki. (Q117460): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 15:20, 29 October 2020

Project Q117460 in Poland
Language Label Description Also known as
English
Revitalisation of the old bathhouse and boulevards on the Black Hańcza river in Suwałki.
Project Q117460 in Poland

    Statements

    0 references
    5,445,398.88 zloty
    0 references
    1,306,895.73 Euro
    13 January 2020
    0 references
    7,779,141.34 zloty
    0 references
    1,866,993.92 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    18 December 2017
    0 references
    17 December 2019
    0 references
    MIASTO SUWAŁKI
    0 references
    0 references

    54°6'9.7"N, 22°55'54.8"E
    0 references
    Projekt obejmuje 2 zadania tj. rewitalizację budynku byłej łaźni z przeznaczeniem budynku na cele publiczne (zadanie 1) oraz rewitalizację z zagospodarowaniem części terenów przyległych w celu utworzenia bulwarów nad rzeką Czarna Hańcza w Suwałkach (zadanie 2). Łączna powierzchnia zrewitalizowanych terenów wyniesie 5,33 ha. Oba zadania znajdują się w zdegradowanym obszarze miasta Suwałki i zaliczone zostały do podstawowych działań rewitalizacyjnych w ramach „Zintegrowanego Programu Rewitalizacyjnego Miasta Suwałki na lata 2017-2023”. Zadanie 1 obejmuje zaadaptowanie historycznego budynku łaźni na obiekt użyteczności publicznej z przestrzenią wystawienniczą przeznaczoną na galerię oraz na potrzeby usług kultury i sportu jako zaplecza bulwarów nad rzeką Czarna Hańcza w Suwałkach w celu prowadzenia licznych działań na rzecz rewitalizacji tego obszaru miasta. W obiekcie znajdzie się również punkt gastronomiczny i wypożyczalnią sprzętu sportowego. Ze względów funkcjonalnych projekt zakłada przebudowę, rozbudowę i nadbudowę, wraz ze zmianą sposobu użytkowania zdewastowanego budynku na budynek użyteczności publicznej pod nazwą „Stara Łaźnia”. Zadanie 2 przewiduje rewitalizację i zagospodarowanie terenów nadrzecznych i utworzenie bulwarów nad rzeką Czarna Hańcza położonych w bezpośrednim sąsiedztwie budynku starej łaźni. Prace obejmą m.in. wykonanie chodników, ścieżek rowerowych i ciągów pieszo-rowerowych, nasadzenia zieleni (trawniki i łąki kwiatowe) z elementami małej architektury, oświetlenie terenu z iluminacją oraz liniami zasilającymi. Prace obejmą też regulację brzegów rzeki z umocnieniem podstawy skarp (od mostu na ul. Mickiewicza do mostu na ul. Kościuszki), budową nabrzeża rekreacyjnego i slipu dla kajaków, przepławkę dla ryb z remontem jazu oraz kładkę dla pieszych i rowerzystów. Koszty ogółem: 13.252.217,97 zł Koszty kwalifikowalne: 7.779.141,34 zł Kwota dofinansowania: 6.223.313,00 zł (EFRR i budżet państwa) Okres realizacji: 18.12.2017-17.12.2019 r. (Polish)
    0 references
    The project comprises 2 tasks, i.e. revitalising the building’s former bathhouse for public purposes (task 1) and revitalising some of the adjacent areas in order to create boulevards on the Black Hańcza River in Suwałki (task 2). The total area of revitalised areas will be 5.33 ha. Both tasks are located in the degraded area of the city of Suwałki and are included in the basic revitalisation activities under the “Integrated Revitalisation Programme of the City of Suwałki for the years 2017-2023”. Task 1 includes adapting the historic bathhouse building to a public utility facility with an exhibition space dedicated to the gallery and for cultural and sport services as a back-up of boulevards on the Black Hańcza River in Suwałki in order to carry out numerous activities aimed at revitalising this area of the city. The facility will also include a gastronomic point and a rental of sports equipment. For functional reasons, the project assumes a reconstruction, expansion and superstructure, along with the change of use of the devastated building into a public utility building called “Stara Łaźnia”. Task 2 provides for revitalisation and development of riverside areas and the creation of boulevards on the Black Hańcza River located in the immediate vicinity of the old bathhouse building. The works will include, among others, the construction of pavements, bicycle paths and walking-bike lines, planting greenery (graves and flower meadows) with elements of small architecture, illumination of the area with illumination and power lines. The work will also include regulating the banks of the river with the fortification of the basin (from the bridge to the street). Mickiewicza to the bridge on ul. Kosciuszko), the construction of a recreational waterfront and a canoe slip, a fish float with a boat repair and a footbridge for pedestrians and cyclists. Total costs: PLN 13.252.217,97 Eligible costs: PLN 7.779.141,34 Amount of co-financing: PLN 6.223.313,00 (ERDF and state budget) Implementation period: 18.12.2017-17.12.2019 (English)
    20 October 2020
    0 references

    Identifiers

    RPPD.08.05.00-20-0007/18
    0 references