Reduction of air pollution in Kamionka Great (Q112327): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 13:16, 29 October 2020

Project Q112327 in Poland
Language Label Description Also known as
English
Reduction of air pollution in Kamionka Great
Project Q112327 in Poland

    Statements

    0 references
    1,517,334.96 zloty
    0 references
    364,160.39 Euro
    13 January 2020
    0 references
    1,540,499.96 zloty
    0 references
    369,719.99 Euro
    13 January 2020
    0 references
    98.5 percent
    0 references
    1 August 2017
    0 references
    31 July 2020
    0 references
    GMINA KAMIONKA WIELKA
    0 references
    Przedmiotem projektu jest wymiana 106 nieekologicznych źródeł ciepła na paliwa stałe na nowoczesne kotły gazowe 96 szt. i biomasowe 10 szt., zgodne z dyrektywą Ecodesign wraz z zakupem niezbędnej armatury i osprzętu oraz przystosowaniem instalacji wew. co i cwu do pracy z nowymi źródłami ciepła w budynkach mieszkalnych na terenie Gminy Kamionka Wielka. Szczegółowy zakres prac zostanie określony na podstawie danych i wytycznych z przeprowadzonych audytów energetycznych budynków. W ramach projektu nie przewiduje się podłączania budynków mieszkalnych do lokalnej sieci ciepłowniczej.Główne Zadania i Działania zaplanowane w projekcie to:ZADANIE 1 Dokumentacja projektowa Działanie 1.1. Opracowanie analizy finansowoekonomicznej projektuZADANIE 2 Wymiana nieekologicznych źródeł ciepła Działanie 2.1. Wymiana kotłów grzewczych Działanie 2.2 Prace przystosowawcze instalacji wewnętrznychZADANIE 3 Edukacja ekologiczna Działanie 3.1. Organizacja spotkań edukacyjnoinformacyjnych Działanie 3.2. Druk ulotek broszur informacyjnychZADANIE 4 Koszty pośrednie Działanie 4.1. Koszty informacji i promocji projektu Działanie 4.2. Koszty zarządzania projektem Działanie 4.3. Kontrola systemów grzewczych Wskaźniki rezultatu projektu: Szacowany roczny spadek emisji gazów cieplarnianych: 736,811 Mg CO2erok 71,40Poziom emisji pyłu PM10: bazowy 3,770 Mgrok docelowy 0,013 Mgrok redukcja 99,66Poziom emisji pyłu PM2,5: bazowy 1,588 Mgrok docelowy 0,013 Mgrok redukcja 99,18W ramach projektu Wnioskodawca zamierza zorganizować spotkania, które skierowane będą do mieszkańców gminy i będą miały na celu podnoszenie świadomości ekologicznej społeczeństwa w gminie. Ponadto Wnioskodawca zamierza stworzyć system kontroli urządzeń grzewczych, badający zgodność instalacji i eksploatacji kotłów z zapisami stosownych umów. Realizacja przedmiotowego projektu wynika bezpośrednio z zapisów POP dla województwa małopolskiego oraz PGN Gminy Kamionka Wielka. (Polish)
    0 references
    The subject of the project is the replacement of 106 non-organic heat sources for solid fuels with modern gas boilers 96 units and biomass 10 units, in accordance with the Ecodesign directive, together with the purchase of the necessary fittings and fittings and adaptation of the abovementioned installations to work with new heat sources in residential buildings in the municipality of Kamionka Wielka. The detailed scope of the work will be determined on the basis of data and guidelines from the energy audits carried out on buildings. The project does not envisage connecting residential buildings to a local district heating network.The main tasks and activities planned in the project are:ADING 1 Project documentation Measure 1.1. Preparation of a financial and economic analysis of the projectTHEARING 2 Exchange of Non-organic Heat Sources Measure 2.1. Replacement of boilers Action 2.2 Adaptation of internal installationsAsk 3 Environmental education Action 3.1. Organisation of educational and information meetings Action 3.2. Print leaflets of information brochuresAsk 4 Indirect costs Action 4.1. Cost of information and promotion of the project Action 4.2. Project management costs Action 4.3. Control of heating systems Project result indicators: Estimated annual reduction in greenhouse gas emissions: 736,811 Mg CO2erok 71,40 PM10 emission level: baseline 3,770 Mgro target 0,013 Mgro reduction 99,66 PM2,5 dust emission level: base 1.588 Mgrok target 0.013 Mgrok reduction 99,18 As part of the project, the applicant intends to organise meetings aimed at the inhabitants of the commune and will aim to raise the environmental awareness of the public in the municipality. In addition, the applicant intends to set up a system of control of heating equipment to examine the conformity of the installation and operation of boilers with the provisions of the relevant contracts. The implementation of this project results directly from the provisions of the POP for the Małopolskie Voivodship and the Gmina Kamionka Wielka. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.04.02-12-0099/17
    0 references