Thermal modernisation of the School Complex in Horodle (Q105325): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
label / enlabel / en
Thermal modernisation of the School Complex in Horodle_2
Thermal modernisation of the School Complex in Horodle

Revision as of 11:45, 29 October 2020

Project Q105325 in Poland
Language Label Description Also known as
English
Thermal modernisation of the School Complex in Horodle
Project Q105325 in Poland

    Statements

    0 references
    1,835,899.19 zloty
    0 references
    440,615.81 Euro
    13 January 2020
    0 references
    2,159,881.41 zloty
    0 references
    518,371.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 October 2016
    0 references
    23 November 2019
    0 references
    GMINA HORODŁO
    0 references
    Przedmiot projektu: głęboka termomodernizacja gminnych budynków użyteczności publicznej (Zespół Szkół w Horodle) wraz z zastosowaniem OZE. Dla budynku opracowano audyt energetyczny, w którym wskazano zakres prac termomodernizacyjnych zwiększających efektywność energetyczną oraz wskazano na konieczność instalacji OZE (kocioł na biomasę i instalacja fotowoltaiczna), które również przyczynią się do zmniejszenia zużycia energii w obiekcie. Zakres projektu: 1. działania termomodernizacyjne: ocieplenie ścian zewnętrznych; ocieplenie stropodachu; wymiana stolarki okiennej i drzwiowej; modernizacja instalacji centralnego ogrzewania (ocieplenie rur, wymiana grzejników, montaż zaworów równoważących oraz termostatycznych); modernizacja oświetlenia wewnętrznego; modernizacja instalacji ciepłej wody użytkowej (przeniesienie zasobnika ciepłej wody do budynku, montaż zaworów termostatycznych i regulacyjnych, zaizolowanie przewodów, wymiana armatury czerpalnej wraz z montażem); 2. wymiana źródła ciepła (OZE - kocioł na biomasę o mocy znamionowej 220 kW); 3. montaż instalacji fotowoltaicznej o mocy 17,08 kW. *wzrost efektywności energetycznej o 55%; *spadek zużycia energii pierwotnej- o 631047,2 kWh/rok; *spadek zużycia energii finalnej - o 293984 kWh/rok; *pozyskana moc z OZE- 0, 23 MW; pozyskana ilość energii z PV- 17 324 kWh; pozyskana ilość energii kotła na biomasę- 273 300 kWh. (Polish)
    0 references
    Subject matter of the project: deep thermal modernisation of municipal public buildings (School Complex in Horodle) with the use of RES. An energy audit was developed for the building, which indicated the scope of thermal retrofitting works to increase energy efficiency and indicated the need to install RES (biomass boiler and photovoltaic installation), which will also contribute to reducing energy consumption in the facility. Scope of the project: 1. thermo-modernisation activities: warming of the outer walls; warming of ceilings; replacement of window and door carpentry; modernisation of central heating systems (pipe warming, radiators replacement, balancing and thermostatic valves); modernisation of internal lighting; modernisation of the hot water installation (transfer of hot water storage into the building, installation of thermostatic and control valves, insulating of wires, replacement of drawable fittings with installation); 2. replacement of heat source (RES – boiler for biomass with rated power of 220 kW); 3. installation of a photovoltaic installation with a power of 17,08 kW. *increase in energy efficiency by 55 %; *a decrease in primary energy consumption- 631047,2 kWh/year; *decrease in final energy consumption by 293984 kWh/year; *RES power generated – 0,23 MW; the amount of energy obtained from PV-17324 kWh; the amount of energy generated by the boiler for biomass – 273300 kWh. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0047/16
    0 references