Insulation of apartment house Drobný 540 NMnM (Q75355): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 04:13, 29 October 2020

Project Q75355 in Czech Republic
Language Label Description Also known as
English
Insulation of apartment house Drobný 540 NMnM
Project Q75355 in Czech Republic

    Statements

    0 references
    1,438,307.99 Czech koruna
    0 references
    57,532.32 Euro
    10 January 2020
    0 references
    3,595,769.98 Czech koruna
    0 references
    143,830.80 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    27 November 2015
    0 references
    31 October 2018
    0 references
    31 October 2018
    0 references
    Město Nové Město na Moravě
    0 references
    0 references

    49°33'58.3"N, 16°4'30.7"E
    0 references
    59231
    0 references
    Zkvalitnění energetické náročnosti dvoupodl.bytového domu s obytným podkrovím, s celkem 20ti byty. Obvodový plášť objektu bude zateplen polystyrenem tl. 140 mm na ploše 463 m2, strop sklepních prostor umístěných v 1.PP pak polystyrenem tl. 100 mm. Stávající krytina a latě budou demontovány, doplní se nadkrokevní izolace, následuje zpětná montáž krytiny. V 1.PP budou vyměněna stávající 2křídlá okna za nová plastová. Úpravami dojde ke snížení stávající spotřeby energie o 103,835 MWh/rok. (Czech)
    0 references
    Improving the energy performance of a two-storey apartment building with a residential attic, with a total of 20 apartments. The perimeter casing of the object will be insulated with polystyrene tl. 140 mm on an area of 463 m², ceiling of cellar spaces located in 1.PP then polystyrene tl. It’s 100 mm. Existing coverings and lashes will be disassembled, super-treatment insulation will be added, followed by retro-assembly of the covering. In the 1stPP, existing 2 wing windows will be replaced with new plastic windows. The modifications will reduce the current energy consumption by 103.835 MWh/year. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0001942
    0 references