Reduction of heat distribution losses in Sternberk, ul. Uničovská (Q19028): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The company VYTEP UNIČOV s.r.o. operates heat management, and has buildings of heat management in the long term lease from MAR-TECH spol. s r.o.The project solves unsatisfactory and outdated technologies used to build the original heat pipeline. At present, heat leaks into the surrounding area occur.The new heat pipeline is solved in the current route. Pre-insulated pipes will be used during the reconstruction. and., translated_summary) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Czech Republic | Project Q19028 in Czech Republic | ||
description / cs | description / cs | ||
Projekt v | Projekt Q19028 v Czechia |
Revision as of 19:16, 28 October 2020
Project Q19028 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of heat distribution losses in Sternberk, ul. Uničovská |
Project Q19028 in Czech Republic |
Statements
3,600,000.0 Czech koruna
0 references
7,200,000.0 Czech koruna
0 references
50 percent
0 references
15 February 2019
0 references
30 November 2018
0 references
AHP 3T s.r.o.
0 references
16000
0 references
Společnost VYTEP UNIČOV s.r.o. provozuje tepelné hospodářství, a má objekty tepelného hospodářství v dlouhodobém pronájmu od společnosti MAR-TECH spol. s r.o.Projekt řeší nevyhovující a zastaralé technologie použité k vybudování původního teplovodu. V současné době dochází k únikům tepla do okolního prostoru.Nový teplovod je řešen v současné trase. Při rekonstrukci bude použito předizolované potrubí. a. (Czech)
0 references
The company VYTEP UNIČOV s.r.o. operates heat management, and has buildings of heat management in the long term lease from MAR-TECH spol. s r.o.The project solves unsatisfactory and outdated technologies used to build the original heat pipeline. At present, heat leaks into the surrounding area occur.The new heat pipeline is solved in the current route. Pre-insulated pipes will be used during the reconstruction. and. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.15/0.0/0.0/15_025/0007048
0 references