Creation of tools for processing and analysing structured large volume data and algorithms (Q19685): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 18:12, 28 October 2020
Project Q19685 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Creation of tools for processing and analysing structured large volume data and algorithms |
Project Q19685 in Czech Republic |
Statements
11,840,929.25 Czech koruna
0 references
26,313,176.0 Czech koruna
0 references
45 percent
0 references
1 November 2017
0 references
31 October 2020
0 references
UTILITY CONSULT, s.r.o.
0 references
60200
0 references
Cílem projektu je vývoj, implementace, certifikace a příprava vstupu na trh aplikací na zpracování a analýzu velkých dat. jedná se o aplikaci určenou pro využití v medicíně s názvem AIXM 5.1 Viewer a aplikaci určenou pro letectví s názvem Analyzér absorbované dávky. Projekt zahrnuje softwarové řešení pro optimální tvorbu digitalizované formy statistických dat, pracovní nástroje pro editace a správu těchto dat. Realizace projektu bude zajištěna devítičlenným vývojovým týmem a potrvá 36 měsíců. a. (Czech)
0 references
The aim of the project is the development, implementation, certification and preparation of the entry into the market of applications for processing and analysis of large data.It is an application intended for use in medicine called AIXM 5.1 Viewer and an application designed for aviation called Analyser of absorbed doses. The project includes software solutions for optimal creation of digitised form of statistical data, working tools for editing and managing these data. Implementation of the project will be ensured by a nine-member development team and will last 36 months. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.4.04/0.0/0.0/16_076/0009512
0 references