Superstructure and building modifications of the Starmon corporate background (Q14157): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 17:35, 28 October 2020

Project Q14157 in Czech Republic
Language Label Description Also known as
English
Superstructure and building modifications of the Starmon corporate background
Project Q14157 in Czech Republic

    Statements

    0 references
    3,541,721.53 Czech koruna
    0 references
    141,668.86 Euro
    10 January 2020
    0 references
    10,119,204.38 Czech koruna
    0 references
    404,768.18 Euro
    10 January 2020
    0 references
    35.0 percent
    0 references
    7 September 2015
    0 references
    14 November 2016
    0 references
    31 December 2016
    0 references
    STARMON s.r.o.
    0 references

    50°0'15.70"N, 16°13'9.73"E
    0 references
    56501
    0 references
    Objekt se nachází v Chocni. Jedná se o hrubou stavbu, ve které bylo původními majiteli plánováno provozování pneuservisu. Objekt je samostatně stojící přízemní budova, která je postavena na betonových základech. Není provedena omítka, chybí obklady, výrazně poškozená okna.Rekonstrukcí stavby dojde k navýšení užitné plochy budovy. Objekt je navržen v technologii zděné výstavby z keramických tvárnic. Zrekonstruovaná stavba bude sloužit jako dílna pro elektromontážní práce pro kolejovou dopravu. a. (Czech)
    0 references
    The building is located in Chocni. It is a coarse construction in which the original owners planned to operate the tire service. The building is a separate ground floor building, which is built on concrete foundations. There is no plaster, no tiles, significantly damaged windows.The reconstruction of the building will increase the utility area of the building. The building is designed in brick construction technology from ceramic blocks. The reconstructed construction will serve as a workshop for electrical installation work for rail transport. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.2.07/0.0/0.0/15_004/0000475
    0 references