Cheek prefabricate for bridge cornices from high-quality concrete (Q10784): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is the purchase of consultancy, expert and support services from the organisation for research and dissemination of knowledge related to the development of cheek prefabricated bridges from high-quality concrete (UHPC), which replaces existing typical elements, but with features such as high durability, weather resistance and last but not least by saving material and necessary transport and installation techniques excee...) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Czech Republic | Project Q10784 in Czech Republic | ||
description / cs | description / cs | ||
Projekt v | Projekt Q10784 v Czechia |
Revision as of 15:50, 28 October 2020
Project Q10784 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Cheek prefabricate for bridge cornices from high-quality concrete |
Project Q10784 in Czech Republic |
Statements
249,999.75 Czech koruna
0 references
333,333.0 Czech koruna
0 references
75 percent
0 references
26 July 2017
0 references
8 December 2017
0 references
8 December 2017
0 references
KŠ PREFA s.r.o.
0 references
14000
0 references
Předmětem projektu je nákup poradenských, expertních a podpůrných služeb od organizace pro výzkum a šíření znalostí týkajících se vývoje lícního prefabrikátu pro mostní římsy z vysokohodnotného betonu (UHPC), který nahrazuje stávající typizované prvky, ale vlastnostmi, jako je vysoká trvanlivost, odolnost proti povětrnostním vlivům a v neposlední řadě úsporou materiálu a nutné techniky k transportu a instalaci, tyto prvky přesahuje. a. (Czech)
0 references
The subject of the project is the purchase of consultancy, expert and support services from the organisation for research and dissemination of knowledge related to the development of cheek prefabricated bridges from high-quality concrete (UHPC), which replaces existing typical elements, but with features such as high durability, weather resistance and last but not least by saving material and necessary transport and installation techniques exceed these elements. (English)
22 October 2020
0 references
Identifiers
CZ.01.1.02/0.0/0.0/16_045/0010595
0 references