Increase in capacity of the new TS Great Bíteš TS (Q68135): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims to increase the capacity of the existing one over 360 tonnes of waste for a year.Technology transfer lines will allow for the classification of waste streams into waste suitable for material recovery and waste for energy recovery, leading to an increase in the material and energy recovery of waste in the catchment area. The Strike Costs of the project are CZK 5.750.000, exclusive of VAT., remove_old_english_translation)
(‎Created claim: summary (P836): The aim of the project is to increase the capacity of the existing sorting line by 360 tons of waste per year.Technology of the sorting line will enable the classification of received waste into waste suitable for material use and waste intended for energy recovery, which will lead to an increase in the share of material and energy recovery of waste in the catchment area. The implementation costs of the project are CZK 5,750,000 without VAT., tr...)
Property / summary
 
The aim of the project is to increase the capacity of the existing sorting line by 360 tons of waste per year.Technology of the sorting line will enable the classification of received waste into waste suitable for material use and waste intended for energy recovery, which will lead to an increase in the share of material and energy recovery of waste in the catchment area. The implementation costs of the project are CZK 5,750,000 without VAT. (English)
Property / summary: The aim of the project is to increase the capacity of the existing sorting line by 360 tons of waste per year.Technology of the sorting line will enable the classification of received waste into waste suitable for material use and waste intended for energy recovery, which will lead to an increase in the share of material and energy recovery of waste in the catchment area. The implementation costs of the project are CZK 5,750,000 without VAT. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to increase the capacity of the existing sorting line by 360 tons of waste per year.Technology of the sorting line will enable the classification of received waste into waste suitable for material use and waste intended for energy recovery, which will lead to an increase in the share of material and energy recovery of waste in the catchment area. The implementation costs of the project are CZK 5,750,000 without VAT. (English) / qualifier
 
point in time: 24 October 2020
Timestamp+2020-10-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:13, 24 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Increase in capacity of the new TS Great Bíteš TS
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,977,600.0 Czech koruna
    0 references
    199,104.0 Euro
    10 January 2020
    0 references
    5,856,000.0 Czech koruna
    0 references
    234,240.0 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    23 January 2021
    0 references
    Technické služby Velká Bíteš spol. s r.o.
    0 references
    0 references
    0 references

    49°17'13.49"N, 16°13'3.14"E
    0 references
    59501
    0 references
    Záměrem projektu je navýšení kapacity stávající dotřiďovací linky o 360 tun odpadů za rok.Technologie dotřiďovací linky umožní roztřídění přijatých odpadů na odpady vhodné k materiálovémuvyužití a na odpad určený k energetickému využití, což povede ke zvýšení podílu materiálového aenergetického využití odpadů ve spádové oblasti.V rámci projektu bude pořízen lis na separovaný odpad a pásový dopravník. Realizační náklady projektujsou 5.750.000 Kč bez DPH. (Czech)
    0 references
    The aim of the project is to increase the capacity of the existing sorting line by 360 tons of waste per year.Technology of the sorting line will enable the classification of received waste into waste suitable for material use and waste intended for energy recovery, which will lead to an increase in the share of material and energy recovery of waste in the catchment area. The implementation costs of the project are CZK 5,750,000 without VAT. (English)
    24 October 2020
    0 references

    Identifiers

    CZ.05.3.29/0.0/0.0/18_104/0009759
    0 references