II/115 delays, delays (Q74891): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at the reconstruction of a section selected by Class II (II/115) in Regensburg, with a total length of 367 m, including through drainage. Section II/115 (ul. “Pražská”) involves the exchange of a layer, a reinforcement of the structure, an improvement of the substructure, the capacity of drainage of the drainage strip with the formation of new roubles along the pavement to control the ground waters from the ground and the trea...) |
(Created claim: summary (P836): The object of the project is the reconstruction of the section of a selected II.class road (II/115) in Řevnice with a total length of 367 m, including drainage solutions. Section II/115 (ul. Pražská) includes the replacement of the abrasive layers, amplification of the structure, improvement of the underlying structural layers, capacity of the drainage strip with the fitting of new curbs along the sidewalk to direct the rainwater from the road a...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the reconstruction of the section of a selected II.class road (II/115) in Řevnice with a total length of 367 m, including drainage solutions. Section II/115 (ul. Pražská) includes the replacement of the abrasive layers, amplification of the structure, improvement of the underlying structural layers, capacity of the drainage strip with the fitting of new curbs along the sidewalk to direct the rainwater from the road and adjust the sideway. Reconstruction of the section of Class II road will increase the utility characteristics of the road, load capacity and safety (English) | |||||||||||||||
Property / summary: The object of the project is the reconstruction of the section of a selected II.class road (II/115) in Řevnice with a total length of 367 m, including drainage solutions. Section II/115 (ul. Pražská) includes the replacement of the abrasive layers, amplification of the structure, improvement of the underlying structural layers, capacity of the drainage strip with the fitting of new curbs along the sidewalk to direct the rainwater from the road and adjust the sideway. Reconstruction of the section of Class II road will increase the utility characteristics of the road, load capacity and safety (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the reconstruction of the section of a selected II.class road (II/115) in Řevnice with a total length of 367 m, including drainage solutions. Section II/115 (ul. Pražská) includes the replacement of the abrasive layers, amplification of the structure, improvement of the underlying structural layers, capacity of the drainage strip with the fitting of new curbs along the sidewalk to direct the rainwater from the road and adjust the sideway. Reconstruction of the section of Class II road will increase the utility characteristics of the road, load capacity and safety (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:25, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | II/115 delays, delays |
Project in Czech Republic financed by DG Regio |
Statements
5,541,188.93 Czech koruna
0 references
6,519,045.8 Czech koruna
0 references
85 percent
0 references
1 August 2016
0 references
8 September 2016
0 references
31 October 2016
0 references
Středočeský kraj
0 references
15000
0 references
Předmětem projektu je rekonstrukce úseku vybrané silnice II. třídy (II/115) v Řevnicích v celkové délce 367m, včetně řešení odvodnění. Úsek II/115 (ul. Pražská) zahrnuje výměnu obrusné vrstvy, zesílení konstrukce, zlepšení podkladních konstrukčních vrstev, zkapacitnění odvodňovacího proužku s osazením nových obrubníků podél chodníku k usměrnění srážkových vod z vozovky a úpravu krajnice. Rekonstrukcí úseku silnice II. třídy dojde ke zvýšení užitných vlastností komunikace, únosnosti a bezpečnosti (Czech)
0 references
The object of the project is the reconstruction of the section of a selected II.class road (II/115) in Řevnice with a total length of 367 m, including drainage solutions. Section II/115 (ul. Pražská) includes the replacement of the abrasive layers, amplification of the structure, improvement of the underlying structural layers, capacity of the drainage strip with the fitting of new curbs along the sidewalk to direct the rainwater from the road and adjust the sideway. Reconstruction of the section of Class II road will increase the utility characteristics of the road, load capacity and safety (English)
23 October 2020
0 references
Identifiers
CZ.06.1.42/0.0/0.0/15_002/0001883
0 references