II/426 — Berec — Strážnice, I/55 (Q74870): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at the reconstruction of the II/426 road in Bzenec — Strážnice, I/55 and the improvement of the state of communication and of the bridges present on the route. The reconstruction works to improve the safety and flow of transport and to extend the lifespan of bridges of arms. The implementation of the project will improve the technical parameters of communication and bridges. Reconstruction is proposed in the existing road II/...) |
(Created claim: summary (P836): The aim of the project is to reconstruct road II/426 in the section Bzenec – Strážnice, I/55 and improve the state of the road and bridges that are located on the given route. The reconstruction will increase the safety and smoothness of transport and extend the service life of bridge buildings. The implementation of the project will improve the technical parameters of communication and bridges. The reconstruction is designed on the existing ro...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to reconstruct road II/426 in the section Bzenec – Strážnice, I/55 and improve the state of the road and bridges that are located on the given route. The reconstruction will increase the safety and smoothness of transport and extend the service life of bridge buildings. The implementation of the project will improve the technical parameters of communication and bridges. The reconstruction is designed on the existing route II/426, the integration of the construction into the territory and the landscape does not change. (English) | |||||||||||||||
Property / summary: The aim of the project is to reconstruct road II/426 in the section Bzenec – Strážnice, I/55 and improve the state of the road and bridges that are located on the given route. The reconstruction will increase the safety and smoothness of transport and extend the service life of bridge buildings. The implementation of the project will improve the technical parameters of communication and bridges. The reconstruction is designed on the existing route II/426, the integration of the construction into the territory and the landscape does not change. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to reconstruct road II/426 in the section Bzenec – Strážnice, I/55 and improve the state of the road and bridges that are located on the given route. The reconstruction will increase the safety and smoothness of transport and extend the service life of bridge buildings. The implementation of the project will improve the technical parameters of communication and bridges. The reconstruction is designed on the existing route II/426, the integration of the construction into the territory and the landscape does not change. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:24, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | II/426 — Berec — Strážnice, I/55 |
Project in Czech Republic financed by DG Regio |
Statements
78,137,842.85 Czech koruna
0 references
91,958,427.83 Czech koruna
0 references
84.97 percent
0 references
1 August 2016
0 references
16 April 2018
0 references
30 April 2018
0 references
Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje
0 references
60200
0 references
Cílem projektu je rekonstrukce silnice II/426 v úseku Bzenec - Strážnice, I/55 a zlepšení stavu komunikace a mostů, které se na dané trase nacházejí. Rekonstrukcí dojde ke zvýšení bezpečnosti a plynulosti dopravy a prodloužení životnosti mostních objektů. Realizací projektu dojde ke zlepšení technických parametrů komunikace a mostů. Rekonstrukce je navržena ve stávající trase silnice II/426, začlenění stavby do území a krajiny se nemění. (Czech)
0 references
The aim of the project is to reconstruct road II/426 in the section Bzenec – Strážnice, I/55 and improve the state of the road and bridges that are located on the given route. The reconstruction will increase the safety and smoothness of transport and extend the service life of bridge buildings. The implementation of the project will improve the technical parameters of communication and bridges. The reconstruction is designed on the existing route II/426, the integration of the construction into the territory and the landscape does not change. (English)
23 October 2020
0 references