Reconstruction of pavements and the setting up of bicycle lanes in the streets of Českosskický, Pražská at Náchod municipal authority — II.Stage (Q74806): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The aim of the project is to build a safe cycling transport corridor for daily routine non-motorised transport into employment, schools, services and leisure activities. The project follows on from the first stage already implemented. Implementation will result in a safe and capacity link between the city and its centre along the main transport artery. At the same time, safe pedestrian movement along the busy road will be ensured., remove_old_...) |
||
Property / summary | |||
Property / summary: The aim of the project is to build a safe cycling transport corridor for daily routine non-motorised transport into employment, schools, services and leisure activities. The project follows on from the first stage already implemented. Implementation will result in a safe and capacity link between the city and its centre along the main transport artery. At the same time, safe pedestrian movement along the busy road will be ensured. (English) / rank | |||
Revision as of 22:23, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of pavements and the setting up of bicycle lanes in the streets of Českosskický, Pražská at Náchod municipal authority — II.Stage |
Project in Czech Republic financed by DG Regio |
Statements
17,000,000.0 Czech koruna
0 references
20,000,000.0 Czech koruna
0 references
85 percent
0 references
25 April 2017
0 references
31 August 2018
0 references
31 August 2018
0 references
MĚSTO NÁCHOD
0 references
54701
0 references
Cílem projektu je vybudování bezpečného přepravního koridoru pro cyklisty, a to pro každodenní běžnou nemotorovou dopravu do zaměstnání, do škol, za službami a za zájmovou činností. Projekt navazuje na již zrealizovanou první etapu. Realizací dojde k bezpečnému a kapacitnímu propojení okrajových částím města s jeho centrem podél hlavní dopravní tepny. Zároveň bude zajištěn bezpečný pohyb chodců podél frekventované komunikace. (Czech)
0 references
Identifiers
CZ.06.1.37/0.0/0.0/16_077/0005856
0 references