Q75343 (Q75343): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 22:17, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
769,414.26 Czech koruna
0 references
2,564,714.22 Czech koruna
0 references
30.0 percent
0 references
2 January 2018
0 references
30 November 2017
0 references
Společenství vlastníků jednotek Pod Hájem 304, Králův Dvůr
0 references
26701
0 references
Obsahem projektu je samostatně stojící dům st. 573/1, 573/2 v obci Králův Dvůr, okres Beroun. Projekt navazuje na dílčí zateplení štítových stěn a střechy dokončením tepelné izolace celé obálky budovy. Je připraven pro snížení energií podle požadavků IROP. Cílem projektu je snížit výdaje za vytápění obyvatel domu v konvergenci s účinkemsnížení emisí v ČR. Návrh k dodržení kritérií pro přidělení dotace jsou uvedeny v projektové dokumentaci. Předpokladem pro realizaci je obdržení dotace. (Czech)
0 references
The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the Czech Republic. The proposal for compliance with the criteria for awarding the subsidy is set out in the project documentation. The prerequisite for implementation is the receipt of the subsidy. (English)
23 October 2020
0 references
Identifiers
CZ.06.2.11/0.0/0.0/16_098/0001888
0 references