Insulation, reconstruction of the roof and installation of a heating source of apartment building No 118 Loučky (Q76132): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The construction works are designed in the context of an existing apartment building. The construction of a new external insulation of the building wall, the insulation of the roof, the replacement of windows and the associated installation of a new roof of roofing. In addition, a new, central heating in the housing stock will be set up with a gas boiler room. Hot water heating shall be the new heat pump. At present, heating and heating is ind...)
(‎Created claim: summary (P836): The building is designed within an existing apartment building. It is a design of new external insulation of the perimeter walls of the house, roof insulation, replacement of windows and related installation of new roofing. In addition, a new central heating with a gas boiler will be established in the apartment building. Hot water heating will be a new heat pump. Currently, heating and heating is provided individually for each housing unit, mai...)
Property / summary
 
The building is designed within an existing apartment building. It is a design of new external insulation of the perimeter walls of the house, roof insulation, replacement of windows and related installation of new roofing. In addition, a new central heating with a gas boiler will be established in the apartment building. Hot water heating will be a new heat pump. Currently, heating and heating is provided individually for each housing unit, mainly by stationary sources for solid fuels and electric heaters. (English)
Property / summary: The building is designed within an existing apartment building. It is a design of new external insulation of the perimeter walls of the house, roof insulation, replacement of windows and related installation of new roofing. In addition, a new central heating with a gas boiler will be established in the apartment building. Hot water heating will be a new heat pump. Currently, heating and heating is provided individually for each housing unit, mainly by stationary sources for solid fuels and electric heaters. (English) / rank
 
Normal rank
Property / summary: The building is designed within an existing apartment building. It is a design of new external insulation of the perimeter walls of the house, roof insulation, replacement of windows and related installation of new roofing. In addition, a new central heating with a gas boiler will be established in the apartment building. Hot water heating will be a new heat pump. Currently, heating and heating is provided individually for each housing unit, mainly by stationary sources for solid fuels and electric heaters. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:17, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation, reconstruction of the roof and installation of a heating source of apartment building No 118 Loučky
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,551,186.8 Czech koruna
    0 references
    102,047.47 Euro
    1 October 2020
    0 references
    6,377,967.0 Czech koruna
    0 references
    255,118.68 Euro
    1 October 2020
    0 references
    40 percent
    0 references
    30 November 2019
    0 references
    Město Nové Sedlo
    0 references
    0 references

    50°12'24.8"N, 12°44'8.5"E
    0 references
    35734
    0 references
    Stavba je navržena v rámci stávajícího bytového domu. Jedná se o provedení nového vnějšího zateplení obvodových stěn domu, zateplení střechy, výměna oken a s tím související montáž nové střešní krytiny. Dále bude v bytovém domě zřízeno nové, ústřední vytápění s plynovým kotlem. Ohřev teplé vody, bude nově tepelným čerpadlem. V současné době je vytápění a ohřev zajišťován individuálně pro každou bytovou jednotku zvlášť a to převážně stacionárními zdroji na tuhá paliva a elektrickými ohřívači. (Czech)
    0 references
    The building is designed within an existing apartment building. It is a design of new external insulation of the perimeter walls of the house, roof insulation, replacement of windows and related installation of new roofing. In addition, a new central heating with a gas boiler will be established in the apartment building. Hot water heating will be a new heat pump. Currently, heating and heating is provided individually for each housing unit, mainly by stationary sources for solid fuels and electric heaters. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0007243
    0 references