Q74373 (Q74373): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of th...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 22:03, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
23,906,420.0 Czech koruna
0 references
28,125,200.0 Czech koruna
0 references
85 percent
0 references
5 February 2016
0 references
30 November 2018
0 references
30 November 2018
0 references
Město Skuteč
0 references
53973
0 references
Výstupem projektu je rekonstrukce hasičské zbrojnice ve Skutči. Tato se nachází v ORP Chrudim, tedy exponovaném území, ve kterém se vyskytují následující klimatické jevy související se změnou klimatu - orkány a větrné smrště, extrémní sucha, nadprůměrné sněhové srážky a masivní námrazy. Proto byl projektový záměr sestaven tak, aby jednotlivé stavební práce vedly k zodolnění budovy vůči účinkům vlivů uvedených mimořádných událostí a složka IZS tak byla více akceschopná. (Czech)
0 references
As a result of the project is the reconstruction of the fire brigade in Skutč. This is located in the ORP Chrudim, i.e. exposed territory in which the following climatic phenomena are associated with climate change – orcs and windstorms, extreme droughts, above-average snowfalls and massive icing. Therefore, the project plan was designed in such a way that individual construction works would lead to the building’s resistance to the effects of the incidents and thus the ICT component was more capable of action. (English)
23 October 2020
0 references
Identifiers
CZ.06.1.23/0.0/0.0/16_055/0002861
0 references