RENOVATION OF THE ROOF OF BD HUMAN 67-79, KARLOVY VARY (Q75209): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project tackles the renovation of the insulation of the existing building roof while at the same time reducing its customs energy performance. At the premises, adjustments will be made to reduce the energy consumption of the building, to the acceptable operating costs and to achieve optimum conditions for the building’s indoor environment., remove_old_english_translation) |
||
Property / summary | |||
Property / summary: The project tackles the renovation of the insulation of the existing building roof while at the same time reducing its customs energy performance. At the premises, adjustments will be made to reduce the energy consumption of the building, to the acceptable operating costs and to achieve optimum conditions for the building’s indoor environment. (English) / rank | |||
Revision as of 22:02, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RENOVATION OF THE ROOF OF BD HUMAN 67-79, KARLOVY VARY |
Project in Czech Republic financed by DG Regio |
Statements
4,247,683.92 Czech koruna
0 references
16,657,584.0 Czech koruna
0 references
25.5 percent
0 references
8 September 2014
0 references
29 September 2017
0 references
30 September 2017
0 references
Společenství vlastníků pro dům Lidická 529-536, Karlovy Vary
0 references
36001
0 references
Projekt řeší rekonstrukci zateplení stávajícího střešního pláště objektu a zároveň snížení jeho celové energetické náročnosti. V objektu budou provedeny stavení úpravy, které povedou ke snížení spotřeby energie na jeho vytápění, k přijatelným provozním nákladům a docílení optimálních podmínek vnitřního prostředí budovy. (Czech)
0 references
Identifiers
CZ.06.2.11/0.0/0.0/15_018/0001032
0 references